Co.,Ltd.
UV/IR Type Flame Detector
RFD-2000X
Document No. Manual-2000X Rev.3
March 2013
- 28 -
Initial Operation
Status
Operate or Output Status
Before inserting
power supply
- Fault Relay signal Open (Normally Open : De-Energized)
- All LED OFF
After
inserting
power
supply
Com
mon
- Fault Relay signal Closed (Normally Closed : Energized)
- After 7 seconds of self-diagonosis test, LED intersect for
3seconds (Yellow → Red → Yellow......) blinking
Normal
- All output, "normal" signal output (Normally Closed : Energized)
- YELLOW LED blinking 0.5Hz
Fault
- Closed of Fault Relay signal (Normally Closed : De-Energized)
- LED "Fault" signal output
- Current "'Fault" signal
- Communication "Fault" signal
[Table 21] Initial Operation of Product
4.3 Safety Handling
There are a few points to be taken note when the products are used with the power
connection.
ㆍ Please refer to the diagrams and specifications on the user manual
ㆍ Do not open the product while the power supply is 'On', especially in dangerous
area, further cautions are needed more.
ㆍ Disassembly and assembly of the internal electrical parts of the product are not
allowed to anyone, except the manufacturer. Unauthorized action within the internal
electrical parts will expire the warranty.
ㆍ When trying to detached the product from its installed place (including full system),
advanced checking for interrelation with related system must be placed to avoid
malfunction.
4.4 Product Testing
4.4.1 Product Testing by using : TL205
TL 205 generates specific UV/IR radiations which can be detected by Rezontech Flame
detector series as fire. It has an individual built in internal power supply hence, it can be
moved and used easily. It can be continuously working up to 30 minutes. For more
details kindly refer to the user manual.
※ If everything is fine without any problem during the testing period by using the test
lamp, the flame detector will generate actual fire alarm signal which can activate all
related fire fight system, so appropriate preparation and inspection must be placed before
the test with TestLamp.