2x4-12' Board
Step 22 Install Soffit
B4
U'1"2/%KIL%(#(2%`\B_]f%E%]F\c_]f%-/#&23
$,99#1%-'(2*$4%H2'$)/2%9/,&%1"2%9'+2%,9%1"2
3,)8*2%8*,+M%1,%1"2%+2(12/%,9%1"2%9#/$1%$,99#1
8*,+M4%?)1%,(2%$,99#1%-'(2*%1,%1"#$%*2(01"
/2&,G#(0%1"2%DQXRD%23024%=($1'**%6#1"%+)1
2302%9*)$"%6#1"%1"2%3,)8*2%$,99#1%8*,+M%'(3
1"2% D1,(0)2D% 2302% +2(12/% ,9% $,99#1% 8*,+M4
<2+)/2% 1,% 8*,+M$% '(3% BEc% )$#(0% % B\B_]f
$1'#(*2$$%1/#&%$+/26$4
@4
=($1'**%9)**%*2(01"%$,99#1%-'(2*$%'*,(0%1"2
$#32%6'**4%?)1%1"2%*'$1%$,99#1%-'(2*%9*)$"%6#1"
1"2%2(3%,9%1"2%3,)8*2%$,99#1%8*,+M4
c4
=($1'**%$,99#1%-'(2*$%,(%1"2%,--,$#12%6'**4
B4
=($1'**%@EC%"'(02/$%,G2/%1"2%DgD%&'/M$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4
5$2%B\B_@f%O,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(M2/%('#*$%1,%$2+)/2
1"2%1/)$$%1,%1"2%&21'*%"'(02/%K)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2L4
@4
:2&,G2%1"2%@E]\B@D%8,'/3$%)$23%1,%8/'+2
1"2%9/,(1%0'8*24%X$%.,)%-/,0/2$$%$211#(0%1/)$$2$
1'+M%1"2$2%8,'/3$%1,%M22-%1/)$$2$%-*)&84
S,(D1%/2&,G2%1"2%@E]$%)(1#*%1"2%/,,9%$"2'1"#(0
#$%'--*#234
Cut Edge
]4
=($1'**%BE]%+,/(2/%1/#&%)(32/%$,99#1%,(%$#32%6'**$%9*)$"%6#1"%9/,(1%'(3%8'+M%6'**
1/#&4%?)1%BE]\FD%1/#&%8,'/3$%9*)$"%6#1"%1"2%8,11,&%,9%1"2%$#3#(04
Step 21 Install Roof Trusses
2x6 Metal
Hanger
'Tongue' Edge