background image

Step 13A

Assemble Rear Gable

2x4 Block

B4

?)1%K@L%16,%@E]\BAD%8,'/3$%1,%'%*2(01"%,9%I^\B_@f4%R,$#1#,(%1"2$2%@E]$7%

on edge

%'(3%8)11%1,021"2/4

@4

R,$#1#,(%K@L%16,%FB\c_]f%*,(0%@EC$%'(3%K@L%16,%^B\c_Ff%*,(0%@EC%8,'/3$%,(%1"2%@E]%-*'12$%'$

$",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/
'1%1"2%1,-4

Assemble the roof gables and trusses on the center of the loft floor. This
will make it easier to stand the gable upright over the lower wall.

2x4 Block

2x4 Block

71-3/8" Long

Truss Leg

2x4 On Edge

97-1/2" Long 2x4 On edge

188-1/2"

71-3/8" Long

Truss Leg

81-3/4" Long

Truss Top

Truss Knee

c4

<2+)/2%1"2%1/)$$%*20%1,%1"2%@E]%-*'12%6#1"

K@L%16,%@\B_@f%*,(0%32+M%$+/26$4

]4

=($1'**%`\B_@f%E%B@f%Z<;%9#**2/$%,(%1"2%@EC

1/)$$%*20$%(2'/%@E]%6#1"%C3%+,&&,(%('#*$4
aE'+1%$-'+#(0%#$(D1%#&-,/1'(14

`4

<N)'/2%1/)$$4%H2'$)/2%3#'0,('**.%9/,&%1"2

M(22%,9%1"2%@EC%1/)$$%1,%1"2%8,11,&%+,/(2/
,9%1"2%@E]%-*'124%!"2%&2'$)/2&2(1$%6#**%82
1"2%$'&2%KBFF\B_@fL%6"2(%1"2%1/)$$%#$%$N)'/24

C4

?)1%@E]%/2&,G23%9/,&%3,,/%,-2(#(0%#(1,

Ff%*,(0%8*,+M$4%!'+M%('#*%,/%$+/26%1"2%8*,+M$
'/,)(3%1"2%-2/#&212/%,9%1"2%0'8*2%9/'&2%1,

-/2G2(1%1"2%0'8*2%9/,&%&,G#(04

Summary of Contents for Sentry Buildings West Virginia

Page 1: ...0 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Assembly Book Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings BCDE FD 3 0 West Virginia 2G 23 H BI7 A B ...

Page 2: ...9 DXD 214 2 1 2 12 1 2 21 6 1 82 23 1 1 2 9 1 9 6 3 91 9 2 21234 T 0 82 9 1 2 9 1 9 6 3 91 9 7 2E12 3 07 91 9 0 3 9 2 1 0 6 82 32 G2 23 8 2 4 6 82 2 12 32 G2 3 6 82 1 9 23 829 2 1 1 32 G2 1 M2 24 H 12 123 1 2 8 M 02 4 2 2 6 223 1 0 9 8 1 32 G2 2 4 Owner Supplied 9 0 2 7 21 9 23027 92 1 3 G2 1 1 2 2 4 22 Step 30 9 N 1 1 223234 R 1 9 3 0 3 1 4 ZG2 2 3 FD E C_C 0 02 3 6 1 6 2 3 36 27 82 1 9 2 0 2 0 9...

Page 3: ...2 12 3 G2 23 6 1 c_ f 1 0 2 3 0 G2 6 3 9 04 Foundation TypesW b 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 X 926 3 992 2 1 1 2 9 9 3 1 2 6 82 64 2 M 1 2 0 3 8 3 0 32 2N 2 2 1 2 4 LP siding A 2 6 1 3 2 3 234 X 16 1 9 12E 1 9 1 2 9 14 R 1 1 2 8 11 2302 9 1 2 3 07 this is important4 H 1 Cf 1 Ff 9 2 2 9 1 2 8 11 2302 9 1 2 3 0 3 1 2 0 34 S D1 6 0 32 1 8 3 ...

Page 4: ...3 1 2 I B_ f 0 6 9 24 4 H M 8 1 9 2 DRear Wall Frames 3 21 9 2 324 c4 1 K L 2G2 2 1 6 1 3 821622 1 2 1 3 8 11 12 4 e 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 K L 16 BC3 0 G 23 32 M 4 5 2 K L 16 BA3 123 M2 2 1 3 1 2 2 1 2 1 124 B4 1 K L 16 E FD K 2 6 82 1 2 123L 1 2 01 9 I B_ f4 R 1 1 2 8 3 1 021 2 3 3 12 6 1 DgD M 6 2 2 1 2 6 1 3 6 82 1234 4 H M D D 6 2 2 821622 9 1 16 1 3 M 4 292 2 23 12 12 4 Stud Spaci...

Page 5: ...2 2 1 2 6 1 3 6 82 1234 Step 3A Assemble 2 Two 12 Side Wall Frames 4 1 K L 2G2 2 1 6 1 3 821622 1 2 1 3 8 11 12 4 e 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 K L 16 BC3 0 G 23 32 M 4 5 2 K L 16 BA3 123 M2 2 1 3 1 2 2 1 2 1 124 c4 2 2 1 1 8 3 KcL 1 22 2 FD 0 6 9 24 4 H M 1 2 9 2 DSide Wall Frames 3 21 9 2 324 Step 2 Assemble 4 Four 8 Long Side Wall Frames Stud Spacing X X X X X X X X 96 Top Wall Plate 96 T...

Page 6: ...de Wall Frames 3 21 9 2 324 Step 4 Assemble Door Header B4 1 K L 16 BAD 0 EF 8 3 1 2 01 9 IIf4 4 Q 12 f E Ff Z 2 M23 M 14 The panel is located below the hardware in A pallet4 1 K L 16 B_ f E Ff 9 2 1 9 1 821622 1 2 EF 8 3 4 c4 X 6 3 0 2 1 8 1 32 9 2 Z 9 2 6 1 8 3 1 1 2 2 12 9 1 2 EF 8 3 4 e 1 021 2 0 BA3 123 M2 4 5 2 KB L 162 G2 23 2G2 2 324 99 Long 2x8 48 OSB Filler GLUE 99 Long 2x8 Step 3B Assem...

Page 7: ... BA3 M2 4 4 1 K L 9 G2 2 2 9 2 1 1 3 1 9 1 821622 2 32 3 1 E 124 1 6 1 BA3 M2 1 0 1 12 3 1 2 1 2 32 4 4 Q 12 cBf 0 2 8 1 E 6 3 6 2 32 7 packed with the windows7 3 K L 2G2 cFf 0 E 4 1 KBL 2 9 1 2 cFf 0 E 1 2 01 9 cBf4 5 2 K L 9 G2 cFf 0 E 6 3 6 O M 2 32 1 4 5 2 1 2 cBf 0 E 124 1 1 2 2 0 cFf 0 E 1 KcL 2 2 3 1 8 G2 E 2 32 4 B4 1 K L 16 E BCD K 2 6 82 1 2 123L 1 2 01 9 B D f4 R 1 1 2 8 3 1 021 2 3 3 1...

Page 8: ...32 9 FD 32 6 9 24 IMPORTANT Z 2 1 2 3 M23 6 1 D D 1 2 4 2 2 9 2 1 021 2 1 1 2 2 0 K L 9 BA3 M2 4 2 6 6 1 2 1 1 3 4 4 1 1 2 1 2 I B_ f 2 6 9 2 1 1 2 2 6 9 24 e 1 2 2 6 9 2 1 021 2 6 2 2 1 2 8 11 6 1 KFL 2 0 1 BA3 M2 K 1 002 2 32 9 1 2 1 3 L 4 92 1 2 End Wall Frames 8 Side Wall Frame Brace wall frames with pre cut wall studs End Marked C End Marked C c4 1 B D 9 27 2E1 1 1 2 9 1 FD 32 6 9 24 e 9 2 1 ...

Page 9: ... f 14 4 1 K L 16 E B D 8 3 1 2 2 32 6 9 24 1 1 2 1 8 3 1 9 14 4 1 1 0 6 1 291 G2 D 0 E 1 E 1 2 12 1 2 12 32 6 9 2 4 Back Wall Frames B4 1 BCD 0 E 1 2 8 M 6 4 5 2 BA3 M2 2 BCf 1 1 2 2 1 2 12 4 4 2 2 1 1 1 BCD 0 E 1 2 12 1 2 12 9 1 6 4 Step 8A Install Siding on Wall Frames 12 Long 2x4 Tie Plate LP siding A 2 6 1 3 2 3 234 X 16 1 9 12E 1 9 1 2 9 14 R 1 1 2 8 11 2302 9 1 2 3 07 this is important4 H 1 ...

Page 10: ...stall Siding on Wall Frames continued c4 1 3 0 12 32 6 4 Cut remove 2x4 Plate 4 H2 0 9 1 2 D1 0 2D 23027 1 3 0 2 1 6 31 9 Ff4 1 1 3 0 2 1 2 9 1 6 6 1 1 2 D 1D 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 3 2 G2 1 2 3 0 1 1 2E12 3 G2 1 2 6 3 6 2 04 4 1 9 6 31 3 0 2 4 2 G2 3 0 1 1 2E12 3 G2 1 2 6 3 6 2 04 C4 Q 12 K L 16 B B_ f E Ff 3 0 2 4 1 1 2 2 1 9 1 8 G2 3 2 07 9 6 1 8 11 9 3 2 32 4 4 1 1 2 2 0 3 0 2 1 2 6 9...

Page 11: ...Step 12 Install Stairs Steps not needed with this size and model Step 9 thru 11 IMPORTANT Go now to the instructions in the stair kit book to install the stairs floor joist and flooring ...

Page 12: ...ke it easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee c4 2 2 1 2 1 20 1 1 2 E 12 6 1 K L 16 B_ f 0 32 M 26 4 4 1 B_ f E B f Z 9 2 1 2 EC 1 20 2 E 6 1 C3 4 aE 1 0 D1 1 14 4 N 2 1 4 H2 2 3 0 9 1 2 M 22 9 1 2 EC 1 1 1 2 8 11 2 9 1 2 E 124 2 2 2 2 1 6 82 1 ...

Page 13: ...1 9 2 1 E 12 0 B_ f 26 4 2 2 1 2 FA B_ f 1 3 1 1 2 2 8 1 9 2 0 B_ f 26 4 Step 13B Assemble Rear Gable continued C4 1 _Ff 3 C B_ f 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 N 2 1 2 2 1 2 1 3 2 84 e 1 E 8 11 12 6 1 BA3 M2 3 26 1 EC 6 1 B_ f 26 4 2 2 1 1 1 1 3 0 1 32 9 0 8 2 9 24 1 2 Gusset at Ridge 1 2 Gusset at Knee 4 Q 12 KcL 1 22 c_ f 0 E 3 1 1 9 1 3 1 821622 9 2 4 cut to fit Studs Framing Square Fra...

Page 14: ...9 6 1 1 2 3 0 1 2 32 6 4 5 2 F3 0 G4 23 B f 14 1x4 Trim c4 1 K L 16 ICf 0 BE 6 12 2 1 8 3 821622 2 8 3 4 3 82 9 6 1 1 2 91 9 4 1 3 8 3 1 9 14 4 2 2 1 1 1 1 1 1 2 9 1 6 2 4 Siding Filler 4 1 FA B_ f 0 3 0 2 4 1 1 2 3 0 1 1 2E12 3 82 3 1 2 0 8 2 9 24 B4 1 3 1 2 0 8 2 9 2 3 32 1 1 1 2 2 9 1 2 8 3 04 R 1 1 2 9 2 6 1 1 2 8 11 1 6 3 1 2 2 6 1 82 2 2 123 912 1 2 3 0 234 1 2 1 3 0 2 6 1 1 2 D 1 2302D 9 6 ...

Page 15: ...8 E 4 Siding Extends Over Trim Paint edge Step 16 Install Rear Roof Gable 4 a 2 1 1 2 0 8 2 8 M 6 4 2 1 3 2 2 0 8 2 3 0 2E12 3 G2 1 8 M 6 4 2 12 0 8 2 6 1 8 11 E 2E12 3 0 B B_ f 1 62 6 E 8 1 32 4 e 1 9 0 BA3 M2 4 c4 2 G2 1 2 6 8 2 9 12 6 3 2 1 2 1 8 2 1 2 0 8 2 1 1 2 91 9 4 Brace Gable with Pre cut Studs B4 1 K L 16 E B D 8 3 1 2 8 M 6 1 2G2 1 1 2 0 8 2 9 9 0 99 3 0 0 8 2 1 1 4 1 K L 16 2 E B 8 3 ...

Page 16: ...cL 1 22 c_ f 0 E 4 1 KBL 2 1 cCf4 R 1 1 2 2 8 3 6 82 64 H2 2 3 1 2 1 8 11 0 8 2 9 2 3 1 KcL 1 22 E 1 1 2 01 3 1 32 cCf 8 34 1 E 6 1 BA3 M2 4 36 Step 17 Assemble Install Front Gable B4 1 KcL 1 22 EC D 3 KBL 2 EC FD 1 12 821622 1 2 9 1 3 2 0 8 2 6 2 2 32 6 4 1 1 2 1 EC 1 9 14 2 EC 12 3 O2 1 B B_ f 1 1 2 E 1 2 12 K 22 S21 DXDL4 e EC 1 1 2 9 6 1 BA3 123 M2 h 3 8 2 6 23 BCf 14 4 1 1 0 1 1 2 2 0 8 2 3 1...

Page 17: ...8 2 1 4 5 2 3 M2 0 6 2 2 1 3 2 1234 c4 1 3 8 2 EC 99 1 8 M 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 M 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 M 32 2 DgD 1 2 1 124 2 2 1 2 1 9 1 2 99 1 8 M 2 8 26 0 1 0 1 2 EC 1 1 2 99 1 8 M 6 1 B_ f 32 M 26 4 S B_Ff 3 212 2 1 2G2 1 1 2 6 3 9 11 04 4 2 2 1 2 99 1 8 M 2 6 1 B_ f 32 M 26 4 S 2 1 2G2 1 1 2 6 3 9 11 04 2 8 11 9 8...

Page 18: ...1 2 f 6 324 302 0 21 cB c_ f 6 324 X 6 3 0 2 6 1 8 821622 1 2 0 21 3 1 2 EC 8 3 4 2 2 0 21 6 1 KcL 1 22 6 9 C3 23 Cf 14 Importanth 6 2 1 0 1 2 0 21 1 1 2 M 227 1 0 21 6 1 1 2 12 1 0 23 32 1 6 3 1 2 3024 See detail at bottom of page4 c4 1 G2 3 0 21 1 1 2 1 2 324 21 1 324 4 X 2 8 2 KB L 162 G2 2 1 2 4 2 G2 E 8 M 9 9 4 71 3 8 Truss Member Add 2x4 Block GLUE Short Side of Gusset Towards Ridge 81 3 4 T...

Page 19: ...4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 M4 c4 1 99 1 2 1 2 12 6 4 B4 1 EC 02 G2 1 2 DgD M 1 2 1 12 3 9 6 1 1 32 2302 9 EC4 5 2 B B_ f O 1 02 4 21 1 20 1 02 4 5 2 BA3 123 M2 1 2 2 1 2 1 1 1 2 21 02 K 2 02 2 2 21 1 0 32 1 2 1 1 2 2 1 0 2L4 4 2 G2 1 2 E B D 8 3 23 1 8 2 1 2 9 1 0 8 24 X 0 2 211 0 1 2 1 M 1 2 2 8 3 1 M22 1 2 84 S D1 2 G2 1 2 E 1 1 2 9 2 1 0 234 Cut Edge 4 1 BE 2 1 32 99 1 32...

Page 20: ...2 2 M4 4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 E 4 8 Soffit Panels 8 Soffit Panel c4 1 K L 16 Ff 6 32 E F c_ f 23 99 1 2 32 1 2 E 6 1 23 32 3 6 3 1 2 DQXRD 2302 1 021 2 1 1 2 M 22 9 1 2 0 8 24 5 2 B B_ f 1 2 1 26 23 B f 14 LAP Edges Step 24A Install Roof Sheathing 302 j2 1 0 2 X 2 B4 292 1 2E1 02 9 1 2 2 1 9 1 2 _BCf Z 2 1 04 H M2 2 1 1 2 1 2 3 1 2 0 8 2 2 84 1 821622 2 1 1 2 1 6 9 2 1 04 9 2 1 0 302 G2 1...

Page 21: ... 96 48 x 72 Plyclip 4 1 1 0 1 0 8 2 M 22 1 9 2 1 0 1 1 2 9 1 9 1 2 8 3 07 refer to the sheathing layout below4 5 0 1 0 1 2302 1 1 2 9 1 221 8 6 1 1 2 99 1 2 4 2 9 2 1 0 3 221 1 2 12 9 1 2 1 2 4 c4 1 Z 9 6 1 8 M 0 8 2 3 04 4 1 1 2 8 11 6 9 2 1 0 1 6 31 9 cCf 2 14 4 1 1 6 9 2 1 0 1 9 14 Z 7 1 Bf 62 1 6 9 G2 1 04 1 KBL 2 821622 2 1 9 1 64 C4 2 2 1 12 32 9 8 3 04 48 x59 Roof Sheathing 48 x83 Roof Shea...

Page 22: ... 9 2 1 0 1 2 2 0 8 24 5 2 B B_ f 1 26 1 2 2 1 2 99 1 2 1 1 2 E 4 5 2 3 M2 1 2 2 1 2 9 2 1 0 1 1 2 E 4 4 2 1 3 2 2 F _Ff 0 E 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x4x81 3 4 2x4x82 5 8 c4 1 c B_ f E Ff 1 8 3 1 1 2 8 11 9 1 2 E 0 B B_ f 1 26 4 ...

Page 23: ...1 1 2 32 9 1 2 0 8 27 9 6 1 1 2 9 2 1 04 Blue Ends Together Step 25B Install Front Gable Trim continued 82 1 4 long 1x6 Trim 82 1 4 long 1x6 Trim Step 26 Install 1x6 Door Jamb B4 1 FD 0 BEC 8 3 1 2 01 3 1 32 1 2 3 2 32 7 9 6 1 1 2 3 04 5 2 F3 0 G4 4 4 1 3 1 BEC E FD 8 3 1 2 32 9 1 2 3 2 04 C4 2 2 G2 0 1 2 8 M 0 8 24 X 1 3 2 1 1 1 2 3 0 9 6 1 1 9 Z 9 2 1 04 ...

Page 24: ...4 1 E 2 32 3 1 2 1 9 3 2 04 2 2 1 1 3 6 1 BA3 M2 4 1x6 Door Jamb 2x4 Cut to Fit 1x6 Door Jamb Step 28 Install 2x4s Around Door Jamb 4 1 BE BAD 1 8 3 3 1 1 2 3 2 07 2 12 23 1 2 1 9 1 2 32 3 1 4 1x4 Door Trim VIEW FROM INSIDE B4 1 1 2 01 3 1 BE FD 1 8 3 1 2 32 9 1 2 3 2 07 9 6 1 1 2 BEC O 8 4 5 2 F3 0 G4 4 2x4 Cut to Fit ...

Page 25: ...1 2 6 3 6 2 0 926 4 Note the front flange projects past the window frame creating a slot for the trim4 5 2 6 1 9 1 2 3 1 2 1 82 2 123 1 2 14 e 23 1 1 0 2 6 M 62 4 c4 2 1 BEc 1 8 3 0 2 32 9 1 2 6 3 67 9 6 1 1 2 1 9 24 2 BEc 32 1 6 2E12 3 82 6 1 2 6 3 6 1 2 2 G2 1 2 8 11 1 4 2 1 1 6 2 1 1 2 32 1 4 292 1 1 2 1 82 6 9 1 2 1 6 31 3 2 01 1 82 234 4 2 2 1 2 1 8 3 0 KCL E 1 2 1 26 4 4 1 1 1 2 1 4 X M 0 0 ...

Page 26: ... BA3 M2 Qty Material Shipped by Local Supplier I E R 2 1 b 1 3 F E FD b R 12 K1 2 123L E B D b 12 K1 2 123L B E BCD b 12 K1 2 123L E FD T 0 Q 82 E BAD T 0 Q 82 BA E B D T 0 Q 82 c E BCD T 0 Q 82 BA BE FD b4R4 3 BE BAD b4R4 3 c BEC FD b4R4 S k 8 BEc FD b4R4 1 0 3 EF BAD S P2 32 EBA FD T k 1 V P2 32 EBA B D T k 1 V P2 32 B EBA BCD T k 1 B EF c_ f VU Q 91 T 0 EF c_Ff QR R 23 3 0 A EF _BCf Z 2 1 0 Qty...

Page 27: ...F f U 8 2 ZG2 0 E E F _Ff U 8 2 b 1 3 E E FA B_ f U 8 2 b 1 3 E E _Ff B U 8 2 b 1 3 E E C B_ f C U 8 2 b T 0 E E c_ f b 3 6 T 0 E E cFf b 3 6 BE E A B_ f b 3 6 BEc E cI _Ff b 3 6 BEc E cIf b 3 6 BEc E c c_ f T 1 U 8 2 ZG2 0 BE E Ff BF 99 1 M EC E BAf S 8 2 99 1 M EC E BAf c _BCf Z 2 1 0 Ff E Fcf _BCf Z 2 1 0 Ff E f _BCf Z 2 1 0 Ff E If B Z P2 32 T 2 c c_ f E Ff Z P2 32 T 2 BBf E Ff R 63 U 21 BB c_...

Reviews: