background image

LP siding

%"'$%'%YA%.2'/%6'//'(1.%'(3%#$%'*/2'3.%-/#&234

%Q--*.%16,%+,'1$%,9%*'12H%'+/.*#+%-'#(1%9,/%1"2%9#(#$"%+,'14
%W'#(1%1"2%8,11,&%2302%,9%1"2%$#3#(07%

this is important

4

V'#(1'#(%Fe%1,%Xe%,9%+*2'/'(+2%9/,&%1"2%8,11,&%2302%,9
1"2%$#3#(0%'(3%1"2%0/,)(34%%_,(G1%'**,6%0'/32(%&)*+"%1,
8)#*3%)-%'(3%L22-%$"/)8$%'%&#(#&)&%,9%EG%'6'.%9/,&%1"2
8)#*3#(04

Exterior Siding Information

Tongue Edge

LAP Edge

Foundation Types & Measurements

Important

Z%I,)%6#**%(223%1,%"'B2%'%-/,-2/%9,)(3'1#,(%#($1'**23%1,%$)--,/1%1"2%8)#*3#(04

_2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14

Do Not 

&'L2%1"2%9,)(3'1#,(%*'/02/%1"'(%1"2%8)#*3#(0%$#R24%\"2(%#($1'**#(0%1"2%8)#*3#(0

,(%'%+,(+/212%$*'87%#($1'**%1"2%$#3#(0%9*)$"%6#1"%1"2%8,11,&%-*'124%\"2(%#($1'**#(0%,(%'%6,,3
9*,,/7%2H12(3%1"2%$#3#(0%]fTe%82*,6%1"2%8,11,&%-*'12%1,%+,B2/%1"2%2302%,9%1"2%9*,,/#(04%%!

\,,3%U*,,/%,(%:)((2/$Z%%<)#1'8*2%9,/%$1,/'02
,/%6,/L$",-4%!/2'123%FHF%*)&82/%,B2/%'%823
,9%0/'B2*%U*,,/%N,#$1%$",)*3%82%1/2'123%@HF
$-'+23%EFe%,(%+2(12/%'(3%+,B2/23%6#1"%]fTe
1,(0)2%'(3%0/,,B2%6,,3%9*,,/#(04

Foundation Types

Z%\"'1%9,)(3'1#,(%#$%82$1%32-2(3$%,(%6"'1%1.-2%,9%#12&$%6#**%82%$1,/234

!"2%8)#*3#(0%+,32%#(%.,)/%'/2'%6#**%'*$,%3212/&#(2%6"'1%1.-2%,9%9,)(3'1#,(%+'(%82%)$234
Q%926%3#992/2(1%1.-2$%,9%9,)(3'1#,($%'/2%$",6(%82*,64%?"2+L%1"2%R,(#(0%'(3%8)#*3#(0%+,32
/2M)#/2&2(1$%#(%.,)/%'/2'4

Wood Floor on Wood Runners

Floating Cement Slab

Foundations Types

U*,'1#(0%<*'8%%Q%+,(+/212%$*'8%#$%#32'*
9,/%$1,/'02%,9%+'/$%,/%,1"2/%1.-2$%,9
"2'B.%#12&$4

Summary of Contents for Roanoke

Page 1: ... 0 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Assembly Book the Roanoke Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings 2B 23 C D7 A E EFGH AG 3 0 ...

Page 2: ... 91 9 0 3 9 2 1 0 6 82 32 B2 23 8 2 4 6 82 2 12 32 B2 3 6 82 1 9 23 829 2 1 1 32 B2 1 L2 24 V 12 123 1 2 8 L 02 4 2 2 6 223 1 0 9 8 1 32 B2 2 4 Owner Supplied 9 0 2 7 21 9 23027 92 1 3 B2 1 1 2 2 4 22 1 2 8 L 02 9 M 1 1 223234 W 1 9 3 0 3 1 4 Assembly Help V 3 1 U 3 XAAS TYSEYDD XZAA 1 YZAA 22L2 3 S 912 D TSXFFST YD 2 1 Z questions barnkits com J 8 2 K Care of product prior to assembly _ 2H 2 82 3...

Page 3: ... Do Not L2 1 2 9 3 1 02 1 1 2 8 3 0 R24 2 1 0 1 2 8 3 0 212 87 1 1 2 3 0 9 6 1 1 2 8 11 124 2 1 0 6 3 9 7 2H12 3 1 2 3 0 fTe 82 6 1 2 8 11 12 1 B2 1 2 2302 9 1 2 9 04 3 U 2 Z 1 8 2 9 1 02 6 L 4 2 123 FHF 82 B2 823 9 0 B2 U N 1 3 82 1 2 123 HF 23 EFe 2 12 3 B2 23 6 1 fTe 1 0 2 3 0 B2 6 3 9 04 Foundation TypesZ 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 ...

Page 4: ...9 gFe4 W 1 1 2 8 3 1 021 2 3 3 12 6 1 GhG L 6 2 2 1 2 6 1 3 6 82 1234 Step 2A Assemble 2 Two 8 Long Side Wall Frames Note When building the lower walls use treated 2x4s for the bottom wall plates Stud Spacing X X X X X X X X 96 Top Wall Plate 96 Treated Bottom Plate 16 15 1 4 16 4 1 JDK 2B2 2S 1 6 1 3 821622 1 2 1 3 8 11 12 4 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J K 16 EF3 0 B R23 32 L 4 5 2 J K 16 E...

Page 5: ...le 2 Two 8 Side Wall Frames continued Step 3 Assemble Door Header E4 1 J K 16 EAG 0 HX 8 3 1 2 01 9 gge4 4 a 12 Te H TXe P 2 L23 L 14 The panel is located below the hardware in A pallet4 1 J K 16 DSEfTe H TXe 9 2 1 9 1 821622 1 2 HX 8 3 4 4 Q 6 3 0 2 1 8 1 32 9 2 P 9 2 6 1 8 3 1 1 2 2 12 9 1 2 HX 8 3 4 1 021 2 0 EA3 123 L2 4 5 2 JE K 162 B2 23 2B2 2 324 Treated Bottom Plate 99 Long 2x8 48 OSB Fill...

Page 6: ... 0 1 2 2 3 1 1 2 3N 2 1 1 3 6 1 EA3 L2 4 T4 U 2S 1 1 3 1 JYK 9 B2 HT 8 L 1 9 1 821622 1 2 3 2 32 3 1 124 B2 2 8 L 0 EA3 L2 1 2S 23 1 1 2 3 2 32 3 1 124 E4 1 J K 16 HTSEFG J 2 6 82 1 2 123K 1 2 01 9 EYGSYe4 W 1 1 2 8 3 1 021 2 3 3 12 6 1 GhG L 6 2 2 1 2 6 1 3 6 82 123 3 G G 6 2 2 1 2 1 1 3 6 82 12344 15 5 Wall Plates 16 11 3 4 13 3 4 16 13 3 4 11 3 4 Treated X X X X Regular X X X X 96 Door Opening ...

Page 7: ...1 2 6 1 3 6 82 1234 Step 5 Assemble 2 Two 12 Side Wall Frames 144 Top Wall Plate 144 Treated Bottom Plate 16 15 1 4 16 4 1 JgK 2 2S 1 6 1 3 821622 1 2 1 3 8 11 12 4 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J K 16 EF3 0 B R23 32 L 4 5 2 J K 16 EA3 123 L2 2 1 3 1 2 2 1 2 1 124 4 2 2 1 1 8 3 1 2 ETTe 0 6 9 24 T4 V L 8 1 9 2 GSide Wall Frames 3 21 9 2 324 Treated Bottom Plate ...

Page 8: ...23 Te 2 12 4 _ 1 1 2 HT 12 1 2 3 2 04 Step 6 Set Wall Frames E4 1 2 9 1 2 g SEf e 2 6 9 2 0 1 32 9 XG 32 6 9 24 2 6 6 1 2S 1 1 3 4 4 1 1 2 1 2 g SEf e 2 6 9 2 1 1 2 2 6 9 24 1 2 2 6 9 2 1 021 2 6 2 2 1 2 8 11 6 1 JXK 2 0 1 EA3 L2 J 1 002 2 32 9 1 2 1 3 K 4 4 1 2 9 1 2 E G 0 2 12 9 24 92 1 2 End Wall Frames 8 Side Wall Frame Brace wall frames with pre cut wall studs End Marked C End Marked C ...

Page 9: ...L 6 4 5 2 EA3 L2 4 T4 1 1 9 1 3 1 HTSXG 8 3 1 2 2 32 6 9 24 Y4 2 2 1 1 1 HT 1 2 12 1 2 12 326 9 2 4 Back Wall Frames E4 1 EFG 0 HT 1 2 8 L 6 4 5 2 EA3 L2 2 EFe 1 1 2 2 1 2 12 4 4 2 2 1 1 1 EFG 0 HT 1 2 12 1 2 12 9 1 6 4 Step 8A Install Siding on Wall Frames 8 Long 2x4 Tie Plate LP siding YA 2 6 1 3 2 3 234 Q 16 1 9 12H 1 9 1 2 9 14 W 1 1 2 8 11 2302 9 1 2 3 07 this is important4 V 1 Fe 1 Xe 9 2 2 ...

Page 10: ...2 1 2 32 6 6 1 1 2 GaQWG 2302 9 6 1 1 2 HT 1 2 8 L 6 4 1 JTK 9 2 3 0 2 4 9 2 2 1 1 2 9 6 1 HT 9 1 6 45 2 X3 0 B4 8 H 23 Xe 14 4 1 3 0 2 1 2 8 L 6 6 1 1 2 GaQWG 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 2 2 4 LAP Edge Side Wall Back Wall Install This Panel First Step 8B Install Siding on Wall Frames continued F4 1 1 2 9 6 31 3 0 1 2 0 1 32 9 1 2 3 2 04 D4 1 3 2 B2 HT 12 1 1 2H12 3 1 2 3 2 04 B2 1 2 HT7 1 6 8...

Page 11: ... 1 2 HEA 9 6 1 1 2 1 9 1 2 1 2 HT 1 2 124 2 2 6 1 J K 16 6 9 EA3 L2 23 Te 1 1 2 1 HT 12 4 1 2 HEA 1 2 6 1 3 6 1 2 EA3 L2 4 See detail below4 Step 9 Install 2x10 Joist Headers 4 1 E G 0 HEA 1 ETASEf e 3 1 1 2 3N 0 E G 0 6 2 4 4 2 2 1 1 1 HEA N 1 2 32 1 2 12 32 6 4 Step 10 Install 2x10 Joist Hangers 10d Sinker Nail 2x4 Tie Plate IMPORTANT If you purchased the optional stair kit go now to the instruc...

Page 12: ...4 x8 Tongue Edge 1 1 0 1 1 2 9 1 J3 6 K 1 fTe cb 9 0 6 1 1 2 G 0 2G 2302 9 6 1 1 2 HT 1 2 12 32 6 4 1 002 1 2 2 12 1 0 112 J 22 82 6K4 1 2 1 8 L 6 4 2 2 9 0 6 1 X3 0 B R23 32 L 23 E e 14 Step 11 Install Floor Joist Step 12 Install Loft Flooring 4 x8 4 x4 4 x8 4 x8 192 Long 2x10 Floor Joist ...

Page 13: ... it easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee 4 2 2 1 2 1 20 1 1 2 HT 12 6 1 J K 16 SEf e 0 32 L 26 4 T4 1 YSEf e H E e 6 3 9 2 1 2 HF 1 20 2 HT 6 1 F3 4 H 1 0 G1 1 14 Y4 M 2 1 4 V2 2 3 0 9 1 2 L 22 9 1 2 HF 1 1 1 2 8 11 2 9 1 2 HT 124 2 2 2 2 1 6...

Page 14: ... 1 2 1 3 2 84 26 8 11 9 2 1 HT 12 0 SEf e 26 4 2 2 1 2 XASEf e 1 3 1 1 2 2S8 1 9 2 0 SEf e 26 4 Step 13B Assemble Rear Gable continued F4 1 D SYfXe 3 FTSEf e 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 M 2 1 2 2 1 2 1 3 2 84 1 HT 8 11 12 6 1 EA3 L2 3 26 1 HF 6 1 SEf e 26 4 2 2 1 1 1 1 3 0 1 32 9 0 8 2 9 24 1 2 Gusset at Ridge 1 2 Gusset at Knee Y4 a 12 J K 1 22 TDS fTe 0 HT 3 1 1 9 1 3 1 821622 9 2 4 cu...

Page 15: ...Flush with Frame Step 14 Install Siding on Rear Gable Frame Step 15 Install Trim on End Walls 16 Rear Wall Side Wall 1x4 Corner Trim IMPORTANT Trim Must Be Installed Before Installing Roof Gables E4 a 12 JTK 9 ESEf e H TXS fTe 3 0 9 2 1 4 1 1 2 2 8 L 6 9 6 1 1 9 9 04 2 2 82 0 821622 1 9 3 0 3 1 4 5 2 926 X3 0 B4 4 Q33 1 2 23 82 64 4 1 3 1 J K 16 EHT SEAG 6 12 2 1 8 3 9 6 1 1 9 9 3 8 11 9 1 2 3 04 ...

Page 16: ...3 8 H 4 Siding Extends Over Trim Paint edge Step 16 Install Rear Roof Gable 4 2 1 1 2 0 8 2 8 L 6 4 2 1 3 2 2 0 8 2 3 0 2H12 3 B2 1 8 L 6 4 2 12 0 8 2 6 1 8 11 HT 2H12 3 0 ESEf e 1 62 6 HT 8 1 32 4 1 9 0 EA3 L2 4 4 2 B2 1 2 6 8 2 9 12 6 3 2 1 2 1 8 2 1 2 0 8 2 1 1 2 91 9 4 Brace Gable with Pre cut Studs E4 1 J K 16 HTSE G 8 3 1 2 8 L 6 1 2B2 1 1 2 0 8 2 9 9 0 99 3 0 0 8 2 1 1 4 1 J K 16 2 HTSE 8 3...

Page 17: ...3 9 8 0 8 L 0 8 2 3 2 2 1 Step 16 1 1 1 2 9 1 0 8 24 _ 1 2 B2 HT 8 L 9 9 4 2 6 82 23 1 2 8 2 1 2 4 You can install the loft doors before you erect the gable Refer to Steps 26 and 29 if you want to install the doors and trim now Step 18 Install 2x6 Truss Plates E4 1 J K 1 22 HFSDG 3 1 1 9 1 JEK 2 HFSXG 1 12 821622 1 2 9 1 3 2 0 8 2 6 2 0 2 32 6 4 2 HF 12 3 N2 1 ESEf e 1 1 2 HT 1 2 12 J 22 _21 GQGK4...

Page 18: ... 2 1 4 5 2 D3 L2 0 6 2 2 1 3 2 1234 4 1 3 8 2 HF 99 1 8 L 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 L 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 L 32 2 GhG 1 2 1 124 2 2 1 2 1 9 1 2 99 1 8 L 2 8 26 0 1 0 1 2 HF 1 1 2 99 1 8 L 6 1 SEf e 32 L 26 4 _ EfXe 3 212 2 1 2B2 1 1 2 6 3 9 11 04 T4 2 2 1 2 99 1 8 L 2 6 1 SEf e 32 L 26 4 _ 2 1 2B2 1 1 2 6 3 9 11 04 2 8 11 9...

Page 19: ...2 0 21 2 Te 6 324 302 0 21 ES fTe 6 324 Q 6 3 0 2 821622 1 2 0 21 3 1 2 HF 8 3 4 2 2 0 21 6 1 J K 1 22 6 9 F3 23 Fe 14 Importanti 6 2 1 0 1 2 0 21 1 1 2 L 227 1 0 21 6 1 1 2 12 1 0 23 32 1 6 3 1 2 3024 See detail at bottom of page4 4 1 B2 3 0 21 1 1 2 1 2 324 21 1 324 T4 Q 2 8 2 JXK 2 0 1 2 1 2 4 2 B2 HT 8 L 9 9 4 71 3 8 Truss Member Add 2x4 Block GLUE Short Side of Gusset Towards Ridge 81 3 4 Tru...

Page 20: ...4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 L4 4 1 99 1 2 1 2 12 6 4 E4 1 HF 02 B2 1 2 GhG L 1 2 1 12 3 9 6 1 1 32 2302 9 HF4 5 2 ESEf e N 1 02 4 21 1 20 1 02 4 5 2 EA3 123 L2 1 2 2 1 2 1 1 1 2 21 02 J 2 02 2 2 21 1 0 32 1 2 1 1 2 2 1 0 2K4 4 2 B2 1 2 HTSE G 8 3 23 1 8 2 1 2 9 1 0 8 24 Q 0 2 211 0 1 2 1 L 1 2 2 8 3 1 L22 1 2 84 _ G1 2 B2 1 2 HT 1 1 2 9 2 1 0 234 Cut Edge T4 1 EHT 2 1 32 99 1...

Page 21: ...HT 1 2 1 9 1 2 9 1 0 8 27 9 6 1 1 2 1 9 1 2 0 8 2 9 24 1 1 2 2 3 6 1 1 2 8 2 L 1 021 2 1 1 2 2 L 9 1 2 0 8 24 5 2 EA3 L2 23 E e 14 4 1 X SYfXe 0 HT 1 2 32 9 1 2 9 1 0 8 27 9 6 1 1 2 32 9 1 2 0 8 2 9 24 Step 24A Install Roof Sheathing T4 1 99 1 2 1 9 1 82S 1622 1 2 1 99 1 2 3 1 2 2 L4 Y4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 HT4 8 Soffit Panels 8 Soffit Panel 4 1 J K 16 Xe 6 32 H TXS fTe 99 1 2 32 1 2 HT 6...

Page 22: ...th Install Upper Sheathing Last 48 Wide Sheathing packed in Pallets Plyclip Install this Row Second 4 1 1 0 1 0 8 2 L 22 1 9 2 1 0 1 1 2 9 1 9 1 2 8 3 07 refer to the sheathing layout below4 5 0 1 0 1 2302 1 1 2 9 1 221 8 6 1 1 2 99 1 2 4 2 9 2 1 0 3 221 1 2 12 9 1 2 1 2 4 4 1 P 9 6 1 8 L 0 8 2 3 04 T4 1 1 2 8 11 6 9 2 1 0 1 6 31 9 Fe 2 14 Y4 1 1 6 9 2 1 0 1 9 14 P 7 1 Ee 62 1 6 9 B2 1 04 1 JEK 2 ...

Page 23: ...1 0 1 2 2 0 8 24 5 2 ESEfTe 1 26 1 2 2 1 2 99 1 2 1 1 2 HT 4 5 2 D3 L2 1 2 2 1 2 9 2 1 0 1 1 2 HT 4 4 2 1 3 2 2 X SYfXe 0 HT 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x4x81 3 4 2x4x82 5 8 4 1 SEf e H Xe 1 8 3 1 1 2 8 11 9 1 2 HT 0 ESEfTe 1 26 4 ...

Page 24: ...f e 0 1 8 3 1 9 1 821622 1 2 32 1 4 1 1 fTe 82 6 1 2 3 2 044 1x6 Keystone 48 1 2 Door Trim 85 Door Trim Step 27 Install Door Trim Blue Ends Together Step 25B Install Gable Trim continued Siding 3 4 Below Trim Siding 3 4 Above Trim Step 26 Install Loft Door Trim E4 1 L2 1 2 1 8 3 fTl 8 B2 1 2 2 12 9 1 2 3 2 04 5 2 X3 0 B4 4 2 2H 23 3 0 6 2 B2 3 1 6 2 1 2 3 2 234 1 J K 16 EHTSXYe 0 1 8 3 9 1 1 2 32 ...

Page 25: ...eft Door Sliding Bolt on the back of left door Y4 1 3 0 8 17 1 2 62 8 L 9 1 2 3 1 2 2 1 3 2 6 2 234 I 6 223 1 3 2 9 1 2 3 91 1 3 1 4 OSB Shim Siding Extends Past Trim Step 28 Install Doors E4 a 1 2 291 3 6 1 1 2 1 9 0 4 2 HT 9 2 1 2 291 3 2H12 3 1 1 2 3 1 4 22 321 82 64 4 1 Fe 02 1 1 2 291 32 9 1 2 3 9 24 1 1 2 02 2 7 3 1 2 2 1 0 12 0 1 1 2 9 24 L22 1 2 9 2 9 11 07 3 EfXe 2 4 5 2 ESDfXe 8 L 26 4 4...

Page 26: ...162 1 Ee 26 4 a 82 3 6 82 64 Left Door Bottom 4 1 1 2 ESEf e 6 32 3 0 2 1 1 2 1 2 3 9 27 9 6 1 1 2 291 9 1 2 3 9 2 4 U 2 6 2H12 3 fTe 82 3 3 0 1 2 0 1 324 Right Door 4 1 Te 3 02 1 1 2 91 3 4 _ EfXe 2 1 L22 1 2 9 2 9 11 04 5 2 1 2 12 ESEfTe 8 L 02 26 4 T4 1 1 2 291 3 9 14 2 3 0 1 2 291 3 2H12 3 82 3 1 2 3 9 24 2 2 1 2 02 1 1 2 EH 1 6 1 ES fTe 26 4 Y4 1 1 2 0 1 3 4 1 8 2 8 1 7 to the back of door7 1...

Page 27: ...TDe aW 3 0 W 2 F 2 4 Te _ O 02 4 2 4 Te 2 1 EX 2 4 ESEfTe O 02 26 EX 2 4 ES fTe O 02 26 TA 2 4 Ee 3 26 Qty Material Shipped by Local Supplier F HT S W 2S 1 1 3 T HT XG W 12 J1 2 123K HT E G 12 J1 2 123K E HT EFG 12 J1 2 123K F HT XG U 0 a 82 T HT EAG U 0 a 82 X HT E G U 0 a 82 HT EFG U 0 a 82 X EHT XG 4W4 3 T EHT EAG 4W4 3 F EH XG 4W4 1 0 3 HX EAG _ O2 32 EA THX fTe cb a 91 U 0 A THX fXe aW W 23 3...

Page 28: ...2S8 1 b 8 2 U 2 EgSEfTeH TXe F S a20 HF H DES fXe F W 12 HF H XTe T b 8 2 PB2 0 HT H X SYfXe T b 8 2 1 3 HT H XASEf e T b 8 2 1 3 HT H D SYfXe E b 8 2 1 3 HT H FTSEf e F b 8 2 U 0 HT H TDS fTe U 1 b 8 2 PB2 0 EHT H Xe EX 99 1 L HF H EAe T _ 8 2 99 1 L HF H EAe DfEFe P 2 1 0 TXe H X e DfEFe P 2 1 0 TXe H D e T DfEFe P 2 1 0 TXe H Yge E P O2 32 U 2 S fTe H TXe T W 63 b 1 EES fTe H Ae EX Ef e P b 8 2...

Reviews: