=9%.,)%/2&,B23%1"2%$#3#(0%9/,&%1"2%,-2(#(0%#(%1"2%9/,(1%0'8*2%9,**,6%1"2%3#/2+1#,($%82*,6%1,
#($1'**%$#3#(0%,(%1"2%*,91%3,,/%9/'&2$4
Suggestion; Paint siding and trim before assembling.
Step 29 Install Gable Loft Doors
E4
a'.%8,1"%3,,/%9/'&2$%,(%'%9*'1%$)/9'+24%=($1'**%1"2%@]e%6#32%$#3#(0%-'(2*%,(%1"2%*291%3,,/4%=($1'**
$#3#(07%
back side facing up
7%9*)$"%6#1"%1"2%/#0"1%$#32%,9%1"2%3,,/%9/'&24%!"2%$#3#(0%6#**%2H12(3
]fTe%82.,(3%1"2%*291%$#32%,9%1"2%9/'&24%!"2%1,-%'(3%8,11,&%,9%1"2%3,,/%9/'&2%6#**%2H12(3%]fTe
82.,(3%1"2%$#3#(04%5$2%J@AK%162(1.%Ee%$+/26$4%a'82*%3,,/%%'$%$",6(%82*,64
Left Door
Bottom
@4
=($1'**%1"2%@ESEf@e%6#32%$#3#(0%-'(2*%1,%1"2
,1"2/%3,,/%9/'&27%9*)$"%6#1"%1"2%*291%,9%1"2
3,,/%9/'&2%4%U/'&2%6#**%2H12(3%]fTe%82.,(3
$#3#(0%,(%1"2%/#0"1%$#324
Right Door
]4
=($1'**%Te%3,,/%"#(02$%1,%1"2%*,91%3,,/$4%_/#**%EfXe%",*2$%1,
L22-%1"2%9/'&2%9/,&%$-*#11#(04%5$2%1"2%$",/12/%ESEfTe%8*'+L
"#(02%$+/26$4
T4
=($1'**%1"2%*291%3,,/%9#/$14%!"2%$#3#(0%,(%1"2%*291%3,,/%2H12(3$
82.,(3%1"2%3,,/%9/'&24%<2+)/2%1"2%"#(02$%1,%1"2%EH]%1/#&
6#1"%ES]fTe%$+/26$4
Y4
=($1'**%1"2%/#0"1%3,,/4%=($1'**%8'//2*%8,*1$7%
to the back of
door
7%'1%1"2%1,-%'(3%8,11,&%1,%$2+)/2%1"2%3,,/$%+*,$234%I,)
6#**%(223%1,%3/#**%'%",*2%9,/%1"2%/,)(3%$"'91%1,%3/,-%#(1,4
Siding Extends 3/4" Beyond Frame
Siding Flush
Frame Extends 3/4" Beyond Siding
Frame Extends 3/4" Beyond Siding
Bottom