2 Rows 10d
Sinker
=($1'**%&21'*%N,#$1%"'(02/$%,(%1"2%@HEA%N,#$1%"2'32/7
3#/2+1*.%'8,B2%2'+"%6'**%$1)34%\"2/2%1"2%6'**
-'(2*$%8)11%1,021"2/%#($1'**%1"2%"'(02/%#(%1"2%+2(12/
,9%1"2%6'**%$1)3$4%=($1'**%1"2%"'(02/%9*)$"%6#1"%1"2
8,11,&%,9%1"2%@HEA%$,%1"2%1,-%,9%1"2%9*,,/%N,#$1%6#**
82%9*)$"%6#1%1"2%1,-%,9%1"2%@HEA4%=($1'**%"'(02/$
6#1"%ESEf@e%"'(02/%('#*$4
16' End Wall
8' Long Wall Panel
92-1/2" Long 2x10
Joist Header
Flush
E4
?)1%'%XG%*,(0%@HEA%8,'/3%1,%g@SEf@e4%=($1'**%1"#$%@HEA%1,%1"2%XG%6'**%-'(2*7%'0'#($1%1"2%EFG%2(3
6'**%-'(2*4%=($1'**%1"2%@HEA%9*)$"%6#1"%1"2%1,-%,9%1"2%1#2%@HT%1#2%-*'124%<2+)/2%6#1"%J@K%16,%/,6$
,9%EA3%$#(L2/%('#*$%$-'+23%Te%'-'/1%'+/,$$%1"2%1,-%@HT%-*'12$4%`'#*%1"2%@HEA%1,%2'+"%6'**%$1)3
6#1"%,(2%EA3%$#(L2/4%
See detail below
4
Step 9
Install 2x10 Joist Headers
@4
?)1%'%E@G%*,(0%@HEA%1,%ETASEf@e%'(3
#($1'**%,(%1"2%'3N,#(#(0%E@G%*,(0%6'**
-'(2*4
]4
:2-2'1%1,%#($1'**%@HEA%N,#$1%"2'32/$
,(%1"2%,--,$#12%$#32%6'**4
Step 10 Install 2x10 Joist Hangers
10d Sinker Nail
2x4 Tie Plate
IMPORTANT:
If you purchased the optional stair kit, go now to the instructions
in the stair kit book to install the stairs, floor joist and flooring. Otherwise, modify
the instructions on Step 11 to provide another way to access to the loft area.