background image

If your door opening is out of square, the space around the doors will not
be even. You can remove and re-position the side trim to make allowances
for this. The side trim does not have to be flush with the frame of the door
opening. You can move the trim in or out to make the door spacing equal.

Left Door

W4

=($1'**%'%8'//2*%8,*1%,(%1"2%#($#32%*,62/%8'+N%,9

1"2%*291%3,,/%1,%$2+)/2%1"#$%3,,/%#(%-*'+2%6"2(
+*,$234%^,)%6#**%(223%1,%3/#**%'%",*2%9,/%1"2%/,)(3
$"'91%1,%3/,-%#(1,4

f4

=($1'**%'(,1"2/%8'//2*%8,*1%'1%1"2%1,-%,9%1"2%3,,/4

Barrel Bolt  on the

back of left door

Step 25 Install Doors

i

T212/&#(2%-,$#1#,(%,9%"#(02$%'(3%#($1'**%1,%$#32

1/#&%6#1"%@d%$+/26$4

`4

=($1'**%1"2%6#(3,6%)$#(0%1"2%6"#12%"2'323%$+/26$4

K4

=($1'**%3,,/%"'(3*2%,(%/#0"1%3,,/4%]"2(%1"2%"'(3*2

#$%1)/(23%1"2%#($#32%*'1+"%6#**%",*3%3,,/$%+*,$234

B4

=($1'**%XiY%1"/22%Wd%"#(02$%1,%$#32$%,9%1"2%3,,/$4%!,%-,$#1#,(

1"2%"#(02%-/,-2/*.7%",*3%1"2%/2+1'(0)*'/%-*'12%'0'#($1%1"2
9/'&24%5$2%@d%8*'+N%$+/26$4

@4

;29,/2%9'$12(#(0%1"2%"#(02$%1,%1"2%1/#&7%12&-,/'/#*.%-/,-

1"2%3,,/$%#(%1"2%,-2(#(04%U2'V2%'%$-'+2%'1%1"2%1,-%'(3%'(3
821622(%1"2%3,,/$%'(3%1"2%$#32%1/#&%1,%'**,6%/,,&%9,/%1"2
3,,/$%1,%2F-'(3%3)2%1,%")&#3#1.4

@F`%I/'&2

BF`%!/#&

<#3(0

=($#32%T,,/%U'1+"

T,,/%<1,-

Summary of Contents for Best Barns Springfield

Page 1: ... 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 ABC the Springfield Revised March 02 2021 Assembly Book Best Barns USA 3 0 D2 B E F AE Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 ...

Page 2: ...cluded in kit 2O 23S 0 2 21 9 07 T M3027 9 0 26 7 L 1 R 1 S N7 302 2 1 I S 3 9 0 3 1 4 2 1 8 3 6 2 2 1 34 2 0 S O 2 G 9 2 2 1 _A 320 22 L 8 G 9 6 3 1 2 2 1 0 1 V2 1 L 12 G 3 8 11 F 23 1 9 2 6 2 L 12 G F 2 1 0 6 2 1 1 021 2 Q2 32 G 1 9 3 2 0 R G R 2 123 1 3 3 UJL G M302 9 3 0 1 1 V2 0 2 0 2 G M302 9 3 0 1 1 V2 23 R 0 D2S 5 N 12 a 0 D2 3 0 1 D2 3 1 24 6 N2 12 2 2 1 9 3 6 2 1 1234 2V 26 1 2 1 1 1 2 8...

Page 3: ... F 2 4 C4 1 FC 9 0 V2 1 2 F 4 5 2 C3 0 V4 23 Cd 14 Material Description 12 x 20 F 2 123 N 0 4 CE F L g 1 Q2 32 4 CE F L g 1 Q2 32 4 B E F L I g 1 Bf 4 B E F 2 123 2 4 CE F 2 123 2 4 B E I 0 KhCd ih d C 4 FC Z V I i 84 C3 Z V D23 T2 N K 84 BW3 I 3 1 D2 B EGAd F AEGAd4 2 N 8 3 0 32 2 7 1 2 1 1 V2 1 024 I 212 87 1 2 2 1 2 8 2 821622 1 2 212 3 1 2 6 12 4 I 2 2 82 23 1 2 2 12 iGBh d 6 32 4 Details for ...

Page 4: ...4 144 Wall Plate Pre Cut Wall Studs 4 1 XCY 2 0 1 2G 1 6 1 3 821622 1 2 1 a 8 11 12 4 1 3 1 6 12 6 1 BA3 N2 7 X Y 16 2 2 34 K4 1 X Y 16 2 3 0 2 4 9 2 2 1 1 2 1 2 9 6 1 1 2 2 3 9 1 2 9 24 4 1 1 2 9 1 3 0 2 6 1 1 2 EUJLE 2302 9 6 1 1 2 2 3 9 1 2 6 4 3 0 6 2F12 3 ih d 82 6 1 2 8 11 124 3 0 6 1 W3 0 V4 7 23 Cd 14 Tip use a 1x4 trim board as a gauge Siding Extends 3 4 Below Plate Siding Flush B4 1 X Y ...

Page 5: ... 3 0 2 1 8 1 32 9 R 3 1 XBY 2 9 2 1 2 2 34 1 1 9 1 2 3 R 9 2 4 1 021 2 6 1 XB Y 162 V2 BA3 N2 23 2V2 2 324 4 2 2 1 1 2 8 2 XiY 1 22 2 BBWGBh d 0 6 9 2 4 2 3 0 6 82 23 912 1 2 6 2 21 1 2 9 4 B4 1 X Y 16 F GBAE 8 3 1 2 01 9 BBWGBh d4 L 1 1 2 8 3 1 021 2 3 3 12 6 1 EeE N 6 2 2 1 2 6 1 3 6 82 1234 4 H N E E 6 2 2 821622 9 1 16 1 3 N 4 292 2 23 12 12 4 i4 1 XWY F 2G 1 6 1 3 821622 1 2 1 a 8 11 12 6 1 X...

Page 6: ...or Opening Siding Extends 3 4 Below Header Siding Extends 3 4 Below Plate 2x8 Door Header 75 1 2 Header Support nail nail B4 1 X Y 16 F GB E 8 3 1 2 01 9 B d 9 6 12 4 L 1 1 2 8 3 1 021 2 3 3 12 6 1 EeE H N 6 2 2 1 2 6 1 3 6 82 1234 i4 1 X Y 16 2G 1 1 3 1 2 01 9 fKGBh d 3 1 2 32 1 4 1 1 3 6 1 BA3 N2 4 4 1 1 2 3 2 32 1 2 F 2 32 1 4 1 1 2 1 3 6 1 BA3 N2 4 K4 2 V2 F 2623 1 1 2 214 H2 2 2 821622 2 32 3...

Page 7: ...2 6 8 11 124 3 0 1 8 N 6 3 F 0 W3 0 V4 23 Cd 14 Step 5 Set Walls i4 1 X Y 9 2 3 0 2 4 U 1 2 6 2F12 3 F 12 iGBh d 1 6 9 2 1 2 2 V2 9 1 6 2 4 4 1 1 1 8 N 6 3 0 1 12 6 4 K4 M 2 1 9 1 6 2 3 2 2 2 6 1 BA3 N2 3 32 6 3 0 1 F 4 2 6 1 2G 1 6 1 3 4 W4 1 3 2 V2 8 11 F 9 3 2 04 f4 6 1 9 1 0 8 11 124 2 BA3 N2 d 14 Back Wall Siding Extends 3 4 Below Plate Cut 2x4 Plate from Opening Tip If you are erecting build...

Page 8: ... 2 12 32 6 4 i4 1 X Y 16 B E 0 F 1 9 1 821622 32 6 1 2 12 3 1 9 1 3 8 N 6 4 Cut 2x4 12 to Fit 2x4 8 Tie Plate Step 7 Install Metal 2x4 Joist Hangers 1 XBCY 2 0 122 F b 1 02 0 23 6 1 1 2 6 1 3 8 1 32 6 4 5 2 1 F 8 N 0 02 1 2 2 1 2 F 7 1 23 2F1 12 7 6 82 9 6 1 1 2 1 9 1 2 F 1 2 12 6 2 1 234 2 2 1 2 02 6 1 BGBh d 02 4 2x4 Gauge Block 2x4 8 Tie Plate Cut 2x4 12 to Fit ...

Page 9: ...s make sure the side walls are plumb The building width should be 12 0 measuring from the outside of the 2x4 tie plates 4 x 8 1 X_Y 2 F GB E 8 3 1 2 01 9 Bifd 3 1 1 2 21 02 4 5 2 BGBh d 02 4 Before installing floor sheathing consider where to locate the 2 x 4 access opening The detail below shows one possibility Regardless of desired layout it is important to install sheathing staggered when possi...

Page 10: ...1 1 2 9 1 6 2 4 Step 9B Install Loft Floor Sheathing continued Siding Filler OSB Filler B4 U 12 XiY 1 22 d F CGih d 9 2 1 4 1 2 2 1 9 1 2 3 0 1 2 8 N 6 4 5 2 W3 0 V4 4 4 1 X Y 16 __d 0 BFi 6 12 2 1 8 3 2 1 1 1 2 8 N 6 4 1 2 01 1 9 6 1 1 9 R 9 2 3 8 11 9 3 04 1 1 9 6 1 1 2 3 0 1 2 32 6 4 5 2 W3 0 V4 23 B d 1 1 1 1 4 B4 U 12 X Y 9 iGBh d F d R 9 2 4 1 1 9 1 3 8 N 2 1 9 F 1 2 12 4 5 2 X Y 9 W3 2 4 2 ...

Page 11: ... 2 2 1 1 021 2 6 82 64 2 0 23 2 1 1 2 8 11 F 6 82 1 0 1 3 2 2 B EGAd 9 2 3 1 2 34 Pre built gable ends highlighted in gray i4 2 1 N BF 8 N 1 91 9 0 3 1 2 9 2 2 82 4 2 2 8 N 6 82 CdGB d 0 3 V2 0 23 2 3 4 H N2 2 X Y 16 9 1 2 2 8 N 2 1 23 32 2 2G8 1 0 8 2 2 3 9 2 6 4 L 1 1 2 2 1 9 1 2 8 N 12 23 1 3 F 24 2 2 6 2 1 1 1 2 3 0 8 2 2 8 1 2F 1 1 2 24 TR R 8 N 1 0 8 24 4 2 2 1 2 8 11 F 1 1 2 0 8 2 1 3 0 X Y...

Page 12: ...2G 1 0 8 2 3 04 N 0 291 1 0 1 1 3 0 2 6 1 E1 0 2E 2302 0 0 1 324 1 9 6 1 2 3 9 9 2 3 2F12 3 0 ih d 82 6 1 2 8 11 F 124 5 2 W3 0 V4 23 Cd 14 K4 U 12 X Y 16 KAGih d 0 F 4 1 1 2 2 2O 23 9 2 12 9 1 2 0 8 24 2 2 1 2 8 11 F 1 1 2 0 8 2 1 3 0 X Y 16 GBh d 26 2 4 W4 1 6 3 0 21 1 2 N4 J 0 2 821622 F 3 0 21 3 0 XB Y 9 122 W3 4 f4 U 12 X Y 16 KGBh dF fGih d 0 21 4 J11 1 2 2 1 1 9 2 0 8 2 1 3 1 2 2 1 1 2 i GB...

Page 13: ... 24 1 1 2 N23 1 2 6 3 6 8 F4 1 3V 8 2 1 1 1 2 6 3 6 912 1 2 0 8 2 21 30 3 4 Long 2x4 77 3 8 Long 2x4 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled B4 U 12 X Y 16 ffGihCd 0 F 912 0 8 24 1 F 9 6 1 1 2 1 9 0 8 2 9 24 5 2 BA3 N2 4 4 U 12 X Y 16 iAGBh d 0 F 912 3 1 1 9 4 F 6 2F12 3 82 3 2 3 9 0 8 24 ...

Page 14: ...2 64 4 11 X Y 16 ffGihCd 0 F 0 1 1 2 1 2 3 4 2 V2 1 2 BF 8 N 1 1 2 23 1 2 8 11 0 8 2 12 3 2 1 1 N22 912 0 234 U 12 BCGBh d 0 F 302 8 N 6 1 0 23 2 3 3 1 1 2 N4 2 2 912 3 302 8 N 1 2 N 6 1 6 3 0 214 1 6 1 XB Y 9 122 W3 3 0 24 i4 1 0 21 1 2 3 4 22 T21 J4 1 6 1 X AY 162 1 W3 3 0 24 4 29 9 1 V2 3 1 1 2 0 21 1 1 2 2 N4 K4 21 1 324 2 2 1 12 1 8 3 XCY 2 0 1 2 1 2 4 W4 2 V2 12 BF 8 N 4 Front Wall Step 15 A...

Page 15: ... installed first This enables the soffit to rest on the trim where it meets the building See lower detail 99 Corner Trim 3 8 Gauge Block B4 U 12 ihCd F id F Cd 3 0 0 02 8 N N23 1 2 36 2 8 04 L 2 1 0 02 8 N 32 1 2 F V2 0 3 8 11 __d 0 BF 1 8 3 0 1 14 1 1 8 3 1 2 01 3 1 1 2 1 9 6 1 1 2 2 1 1 2 8 N 9 1 2 8 3 04 5 2 W3 0 V4 4 4 2 2 1 1 1 2 1 1 1 2 1 2 1 22 2 4 i4 1 XiY 1 22 f E 0 BFi 1 0 1 2 1 9 1 2 32...

Page 16: ... i4 U 12 XWY F _Gih d F Cd 99 1 2 4 H2 2 9 2 12 9 9 1 1 1 2302 9 99 1 0 8 24 1 99 1 2 1 1 2 01 4 H N2 2 EUJLE 2302 1 2 32 1 994 4 1 2 99 1 2 1 1 2 2 3 9 1 2 F 4 22 Detail C 82 64 K4 1 2 99 1 2 0 1 2 32 9 1 2 8 3 0 11 0 1 2 1 99 1 2 9 6 1 1 2 F 1 2 2 0 8 24 W4 2 2 1 12 iGK 1 1 99 1 2 1 2 9 1 0 8 2 3 1 2 12 32 6 4 1x4 72 Trim Board Detail C Nail Soffit to End of 2x4 9 3 4 Soffit Soffit 9 3 4 W i d e...

Page 17: ... 0 23 6 1 1 2 1 9 1 2 1 2 4 2 9 2 1 07 installed later7 3 2 1 1 2 9 4 5 2 1 0 1 2302 6 82 64 5 2 W3 0 V4 4 48 x 51 48 x 48 48 x 75 51 48 x 96 48 48 x 59 1 4 48 x 35 1 4 59 1 4 Step 21A Install Roof Sheathing Plyclip Cut From 48 x96 23 2 1 N 14 B4 U 12 X Y CdF_Wd 221 9 R 4 1 9 1 2 2 X Y 16 CdFK_GBh d 221 4 I 3 1 X Y 16 CdFiKGBh d 221 4 4 U 12 X Y CdF_Wd 221 9 R 4 1 1 2 2 9 1 N2 X Y 9 CdF Cd 221 4 i...

Page 18: ... 8 24 i4 2 1 6 9 2 1 0 6 6 0 1 1 2 1 1 6 V2 1 1 9 302 V2 1 234 2 1 X Y 16 G 1 1 2 9 2 1 0 821622 2 1 1 1 2 1 67 22 3 6 0 2V 024 9 Step 21B Install Roof Sheathing continued Step 22 Install 2x4s in Front overhang B4 1 1 0 1 1 2 2 N 1 ffGihCd 0 F 821622 1 2 9 2 1 0 3 1 2 99 1 2 4 21 1 8 3 9 6 1 2302 9 99 1 2 3 9 2 1 04 5 2 W3 0 V4 99 1 3 W3 1 0 1 2 9 2 1 04 Nail with 6d Sinkers Nail with 6d Galv J 2 ...

Page 19: ...Long 1x4 Door Trim i4 1 C d 0 BF 1 8 3 2 12 23 8 V2 3 2 04 2 8 3 8 V2 2 0 8 ih d4 5 2 W3 0 V4 4 4 1 fWGih d 0 BF 1 8 3 2 32 9 1 2 3 2 0 3 32 D 1 1 4 N 1 2 2 1 8 3 9 67 6 1 1 V2 1 2 1 6 2 6 1 1 1 23 1 2 3 4 82 Long 1x4 Door Trim Install Trim 3 4 above Opening T 1 2 2 1 3 3 1 32 3 6 4 1 GBh d F Cid 0 8 3 3 1 1 1 2 0 1 32 9 2 9 1 2 3 4 6 82 1 2 291 3 6 2 1 234 2 3 1 3 2F12 3 ih d 82 3 1 2 32 9 2 9 1 ...

Page 20: ...8 N 9 1 2 291 3 1 2 2 1 3 2 6 2 234 6 223 1 3 2 9 1 2 3 91 1 3 1 4 f4 1 1 2 8 2 8 1 1 1 2 1 9 1 2 3 4 Barrel Bolt on the back of left door Step 25 Install Doors i T212 2 1 9 02 3 1 1 32 1 6 1 d 26 4 4 1 1 2 6 3 6 0 1 2 6 12 2 323 26 4 K4 1 3 3 2 0 1 3 4 2 1 2 3 2 1 23 1 2 32 1 6 3 3 234 B4 1 XiY 1 22 Wd 02 1 32 9 1 2 3 4 1 1 2 02 2 7 3 1 2 2 1 0 12 0 1 1 2 9 24 5 2 d 8 N 26 4 4 29 2 9 12 0 1 2 02 ...

Page 21: ...ering Bi 83 4 9 0 2 _ 4 9 E3 E M302GBAE Install Roofing Not Supplied in Kit B4 1 21 9 230 0 0 1 2 2 3 6 3 1 2 9 1 2302 9 1 2 9 2 1 04 4 1 0 2 3 0 1 1 2 1 1 1 2 6 2 4 Roof Sheathing 1x6 Trim Metal Roof Edge 2x4 Overhang ...

Page 22: ... d R 2 1 0 fhBWd Cd F KBd R 2 1 0 B fhBWd Cd F Cd R 2 1 0 fhBWd Cd F fKd R 2 1 0 fhBWd _Gih d F Cd R 2 1 0 fhBWd _Gih d F KBd R 2 1 0 fhBWd _Gih d F K_GBh d R 2 1 0 fhBWd iGBh d F d R 2 1 0 fhBWd fGBh d F Cd R Q2 32 I 2 B ihCd 99 1 3 _Gih dF CGih d W ihCd I 2 3 d F CGih d 8 4 BA3 N2 K 8 4 W3 Z V4 f 8 4 W3 B 84 BGBh d Q 02 K GBh d 3 26 B F g 1 Q 02 KA L 9 9 2 1 0 i BW D4 11 2 3 Z 2 B 3 Z 21 BKGih d...

Page 23: ...plied by Local Supplier j1 4 i 4 F L 2G 1 1 3 Bf 4 F G B E a 2 L 12 4 F G CE a 2 L 12 C 4 F G BAE a 2 L 12 4 FC G CE T Q2 32 BK 4 MF12 3 0 FC B 4 R 2 1 0 FC Qty Material Shipped in 4 Extension Kit 912 F ffGihCd 3 BFi Cd 3 BFW Cd 302 N F BCGBh d L 2G8 1 J 2 8 2 G 291 3 L 2G8 1 J 2 8 2 G 0 1 3 L 23 99 1 3 ihCd F _Gih dF CGih d R 2 1 0 fhBWd F _Gih dF Cd 3 Z 21 BKGih d F fGBh d g 1 Q 02 F C 2 4 fhBWd...

Page 24: ......

Reviews: