Operating the machine
23
5.9.3
Close testing chamber
Fig. 12: Lid
Tighten all 4 screws hand tight
5.9.4
Starting the process
Fig. 13: Display
When the
cover is locked (after pressing F3) the display shows “READY”
and the process can be started by pressing F1
The grinding process takes 15 minutes according to Bond Index and is
therefore fixed.
Pos : 7. 21 /0025 War nhi nweis e/ V0024 VORSICHT Ver brühungen Ver brennungen - H eißer M ahlbec her @ 2\ mod_1268042733909_9.doc x @ 18937 @ @ 1
os: 7. 22 / 0005 R ETSCH /0005 RET SCH Bedienungs anl eit ung en Kapi tels ammlungen/R S 300 XL/20 Bedi enung RS 300 XL/ 2025 M odul Vor dem Start en @ 7\ mod_1390387649609_9. doc x @ 54860 @ @ 1
I
Summary of Contents for AT 100 XL
Page 31: ......