Smart Resource Booking Technology
www.resourcexpress.com
14
Appendix B: Mounting Instructions
(Slim-line VESA Bracket)
Glass Walled Rooms
1.
Using a suitable spirit level, where the screen is to be located, mark the position where
the bracket is to be mounted with marker pen or masking tape. The recommended
height to the centre of the screen from the floor level is 1500mm.
2.
If the bracket has been supplied separately to the screen, separate the bracket into its
two halves and fix the half shown below to the back of the screen using the 4 off M4 x
5mm pan head screws supplied.
Image showing rear of screen, bracket half
3.
Thoroughly clean the area on the glass to be bonded using sachets provided and wait
for all liquid to evaporate (Note: light use of a fine abrasive such as Scotchbrite, prior
to cleaning, will ensure a sound surface for bonding). The VHB tape should already be
fixed to the other half of the bracket but if not, ensure the area on the bracket is also
prepared as above.
4.
Peel off the protective backing for the tape on the other half of the bracket and apply
it to the glass in the position marked in stage 1. Making sure it is still level (using a spirit
level) press firmly for as long as possible to ensure a good bond with no air pockets.
Viewing from the other side of the glass should highlight any air pockets (these need to
be eliminated to ensure a good bond).