background image

N1-HV/AC Series

User Manual

14

N1-HV/AC Series

User Manual

15

Lifting and Handling

The unit is heavy. Do not lift it alone.

·

During lifting procedures ensure that the unit is firmly secured to avoid the risk of accidental tipping or dropping.

·

Parts serving for support or immobilization of unit shall be designed and manufactured so as to minimize the risk of 

physical injuries and of accidental loosening of fixing.

·

Ensure that the method of lifting will not allow the unit to slip from chains and slings or turn-over or slide from lifting 

devices.

5.5 Preparation

No.

Tool

Model

Function

1

2

3

4

5

6

7

8

9

Level

BOSCH HD18-2 Two-

Speed Hammer Dril

Make sure the bracket is 

properly  installed

Drill holes on the wall

Hanging the bracket

Hanging the bracket

Strippling plier for PV cable

Crimping plier for PV cable

Crimping tool for RJ45 terminal

Crimping Tool For Insulated

 Electrical Connectors

Wiring

KIMO 20V 1/2 Cordless 

Brushless Impact 

Wrench Set

PV-AZM-410

PV-CZM-22100

Screwdriver

RJ45 Crimping Tool

Crimping plier

Hammer

5.6  Installation steps

Step 1: 

Screw the wall bracket on the wall

·

Use the wall bracket as a template to mark the position of the 4 holes.

Step2: 

 Hang the N1 HV/AC Inverter on the wall bracket.

·

Transportation of the inverter needs at least 2 people, each one needs to use the handles at the sides of the inverter.

·

Hang the inverter over the bracket, move the inverter close to it, slightly laydown the inverter make sure the 4 mounting 

bars on the back of the inverter is fixed well with 4 grooves on the bracket. 

·

Drill holes with 

ф

10 driller carefully, make sure the holes are deep enough (at least 45mm) for install and tight the expansion 

tubes.

·

Install the expansion tubes in the holes, and tight them. Install the wall bracket using the expansion screws in the screw 

package.

·

Transportation must be carried by specialized person (truck operators. Hook-up personal), equipped with the necessary 

protection equipment (overalls, safe shoes, protective gloves, helmets, goggles)

·

Do not walk or stand beneath or in the proximity of the load.

·

Avoid sudden movements and jolts when unloading and positioning the unit. Internal handling procedures must be 

conducted with care. Do not exert leverage on the components of the machine.

·

If the unit is not balanced apply ballast. Any protruding parts should not be supported by hand.

·

The inverter should be installed so that the operating panel shall be easily accessible- easy access to the electrical power 

connection point.

·

Accessible for maintenance and repair work.

·

Parts  serving  for  support  or  immobilization  of  unit  shall  be  designed  and  manufactured  so  as  to  minimize  the  risk  of 

physical injuries and accidental loosening of fixings.

·

Loading capacity and hardness of the supporting surface, load rating of mounting bracket should be at least four times the 

weight of the devices according to IEC62109-1. And supporting characteristics will be impaired by wear, corrosion, material 
fatigue or ageing, This should be calculated by inspection of the design data of supporting material and consulting construc-
tion engineer.

Summary of Contents for N1-AC Series

Page 1: ...N1 HV 3 0 N1 HV 3 68 N1 HV 5 0 N1 HV 6 0 N1 AC 3 0 N1 AC 3 68 N1 AC 5 0 N1 AC 6 0 UserManual Series N1 HV AC...

Page 2: ...nsportdamage 13 5 3 Installationprecaution 13 5 4 Availablespace 13 5 5 Preparation 13 5 6 Installationsteps 15 5 7 ElectricalWiringConnection 16 5 7 1 PVWiringConnection 17 5 7 2 BatteryConnection 18...

Page 3: ...t 2 2Important safety instructions 1 2 Target group This manual is intended for quali ed electrical technical personnel who are responsible for hybrid inverte AC coupled installation and commissioning...

Page 4: ...ill void warranty and warranty claims and in most cases termi nate the operating license When the enclosure lid is removed live components can be touched which can result in death or serious injury du...

Page 5: ...rority 1 Generated solar energy 2 Load consumption 3 Storage in battery 4 Feed the excess solar energy into the grid 1 Load consumption 2 Feed into grid 3 Charge the battery 3 4 1 2 3 2 1 This mode ap...

Page 6: ...blackout 1 Generated solar energy 2 Storage in Battery 3 Load consumption 4 Grid supply power Figure 3 2 Terminals 2 4 1 3 WARNING Make sure the load powering rating in within the EPS s output rating...

Page 7: ...rated Duration s Max Efficiency Euro Efficiency MPPT Efficiency Max Battery Discharge Efficiency DC Insulation Monitoring Input Reverse Polarity Protection Anti island Protection Residual Current Moni...

Page 8: ...5 Make sure the installation site does not fall into one of the following conditions Do not install the inverter in direct sunlight Do not install the inverter on ammable construction material Do not...

Page 9: ...ake sure the 4 mounting bars on the back of the inverter is xed well with 4 grooves on the bracket Drill holes with 10 driller carefully make sure the holes are deep enough at least 45mm for install a...

Page 10: ...ugs are similar with PV plugs please con rm before use it 1 Turn off the DC switch 2 Prepare 2 5 4mm2 PV cable and PV plugs as below 3 Strip 7mm of the conductor with stripping plier Use a suitable st...

Page 11: ...tery Power Cable Connection 1 Prepare the tin plated cables with a conductor cross section of 4 to 6 mm AWG 10 2 Strip 15mm off the conductor Use a suitable stripping tool for this e g Knipex Solar 12...

Page 12: ...land torque 4 Nm 5 Nm Make sure that the rib of the terminal block and the groove on the housing engage perfectly until a Click is heard or felt 5 7 3AC Output Connection N1 HV AC series inverters hav...

Page 13: ...uirements of local Australian grid code AS NZS 4777 2 which among speci c requirements for connection calls for compatibility with Demand Response Enabling Devices DRED The DRED is under control of a...

Page 14: ...g Comm Addr PV Connection Comm OK PV Connection Multi OK Settings Data Time Work Mode PV Config Normal Power W Battery XX XX XX XX XX Normal Ppv W Pbat W Normal Pac W Pfeed W Pload W Normal ENV_S Char...

Page 15: ...OK Feature Remote Control DRM0 Meter Setting Meter Setting Disable OK Normal Power W Battery XX XX XX XX XX Normal Ppv W Pbat W Normal Pac W Pfeed W Pload W Normal ENV_S Charger_S Inv_S Normal WorkMo...

Page 16: ...Time Use OK Work Mode Backup Use OK Work Mode Feedin Use OK Work Mode FFR Use OK This function can set the mode of PV input There are two modes for selection Comm and Multi The Comm mode means single...

Page 17: ...Press up or down button to set the parameters of battery Press OK to con rm I Off Grid Battery Battery Awaken No OK Battery Dischr Max Curr 25 0A OK Battery Chr Max Curr 25 0A OK Battery Min On Grid S...

Page 18: ...k help from us if not go back to normal state Grid is lost System will reconnect if the utility is back to normal Or seek help from us if not go back to normal state Grid voltage out of range System w...

Page 19: ...seek help from us if not go back to normal state Other device fault Turn off the PV battery and grid reconnect them Or seek for help from us if cannot back to normal The residual current circuit is f...

Page 20: ...Have it carried out according to local waste handling regula tions Please be sure to deliver wasted inverters and packing materials to certain site where can assist relevant department to dispose and...

Reviews: