Lifting and Handling
The unit is heavy. Do not lift it alone.
·
During lifting procedures ensure that the unit is firmly secured to avoid the risk of accidental tipping or dropping.
·
Parts serving for support or immobilization of unit shall be designed and manufactured so as to minimize the risk of
physical injuries and of accidental loosening of fixing.
·
Ensure that the method of lifting will not allow the unit to slip from chains and slings or turn-over or slide from lifting
devices.
5.5 Preparation
No.
Tool
Model
Function
1
2
3
4
5
6
7
8
9
Level
BOSCH HD18-2 Two-
Speed Hammer Dril
Make sure the bracket is
properly installed
Drill holes on the wall
Hanging the bracket
Hanging the bracket
Strippling plier for PV cable
Crimping plier for PV cable
Crimping tool for RJ45 terminal
Crimping Tool For Insulated
Electrical Connectors
Wiring
KIMO 20V 1/2 Cordless
Brushless Impact
Wrench Set
PV-AZM-410
PV-CZM-22100
Screwdriver
RJ45 Crimping Tool
Crimping plier
Hammer
5.6 Installation steps
Step 1:
Screw the wall bracket on the wall
·
Use the wall bracket as a template to mark the position of the 4 holes.
Step2:
Hang the N1 HV/AC Inverter on the wall bracket.
·
Transportation of the inverter needs at least 2 people, each one needs to use the handles at the sides of the inverter.
·
Hang the inverter over the bracket, move the inverter close to it, slightly laydown the inverter make sure the 4 mounting
bars on the back of the inverter is fixed well with 4 grooves on the bracket.
·
Drill holes with
ф
10 driller carefully, make sure the holes are deep enough (at least 45mm) for install and tight the expansion
tubes.
·
Install the expansion tubes in the holes, and tight them. Install the wall bracket using the expansion screws in the screw
package.
·
Transportation must be carried by specialized person (truck operators. Hook-up personal), equipped with the necessary
protection equipment (overalls, safe shoes, protective gloves, helmets, goggles)
·
Do not walk or stand beneath or in the proximity of the load.
·
Avoid sudden movements and jolts when unloading and positioning the unit. Internal handling procedures must be
conducted with care. Do not exert leverage on the components of the machine.
·
If the unit is not balanced apply ballast. Any protruding parts should not be supported by hand.
·
The inverter should be installed so that the operating panel shall be easily accessible- easy access to the electrical power
connection point.
·
Accessible for maintenance and repair work.
·
Parts serving for support or immobilization of unit shall be designed and manufactured so as to minimize the risk of
physical injuries and accidental loosening of fixings.
·
Loading capacity and hardness of the supporting surface, load rating of mounting bracket should be at least four times the
weight of the devices according to IEC62109-1. And supporting characteristics will be impaired by wear, corrosion, material
fatigue or ageing, This should be calculated by inspection of the design data of supporting material and consulting construc-
tion engineer.