
6
Hydraulic connection
Hydraulic connection drawings
All components and safety devices must be provided by the customer.
A
B
C
D
E
F
1
2
3
1
4
5
6
7
8
9
8
10
11
Fig. 7: Hydraulic connection drawings
A:
Cold water inlet
B:
Inlet 2nd heat generator
C:
Return flow 2nd heat generator
D:
Condensate drain
E:
Hot water outlet
F:
Hot water
1:
Shut-off valve
2:
Storage tank recharging (by oil, gas or solar)
3:
Flap valve
4:
Immersion sleeve (for oil, gas or solar)
5:
Storage tank emptying
6:
Electric heating coil
7:
Circulation pump
8:
Flap valve
9:
Safety valve, 6 bar
10:
Safety temperature limiter
11:
Magnesium anode
CAUTION!
If no circulation is connected then the circula-
tion connection nozzles must be sealed water-
tight.
REMKO RBW
16
Summary of Contents for RBW 300 PV
Page 9: ...Lid dimensions 620 mm 460 mm 300 mm 150 mm 150 mm 160 mm 400 mm Fig 2 Lid dimensions 9...
Page 45: ...45...
Page 46: ...REMKO RBW 46...
Page 47: ......