REMKO PGT 100 Manual Download Page 4

Starting

 

 

Make sure to charge a person with the operation of the 
unit and with the supervision of the reservoirs and of the 
bottle stock who has been instructed sufficiently regar-
ding the handlings concerned. 
Make sure to draw the operators‘ attention to possible 
dangers during the handling of liquid gas.

 

Connect pressure controller to the 
gas bottle(s). 

 

Attention – left-handed thread!

 

Open bottle valve(s). 

 
When gas is taken out of several 
gas bottles simultaneously, all the 
valves have to be opened. 

Press release button of the hose 
security device (protection against 
breakage) 

after having opened

 

the 

valve(s).  
This has also to be done after each 
replacement of bottles. 

After the installation and connec-
tion of the units all the gas bearing 
connections have to be checked 
with soap solution, leakage detec-
ting spray etc. to make sure that 
they are tight. 

 
Do not use open flames! 

1)   Unscrew gas hose 

 
      Turn union nut clockwise 
 

2)   Fasten gas hose 

 
      Turn union nut anti-clockwise 
 

This procedure also refers to all 
further gas components, such as 
pressure controller, hose security 
device (protection against break-
age), etc. 

Important Installation Hint 

 
When installing or removing the gas hose make sure to 

exert a counterpressure 

on the 

gas connection 

nipple 

of the unit using an open-end spanner SW 19 

and observing the left-handed thread. 

A constant unit connection pressure of 1.5 bar 
(1500 mbar) must be ensured, also during con-
tinuous operation. 

G

 

1. 

2. 

Install only in well ventilated rooms, not in rooms which people will be using for longer periods! 

G

 

G

 

The setting can also be continuously adjusted when the 
unit is operating. 

4)   Setting/Regulating the Heating Capacity

 

 

Set desired heating capacity by means of the 
continuously adjustable “power regulation”. 

Turn to the left: 

i n c r e a s e d   h e a t i n g   c a p a c i t y 

 

Turn to the right: 

r e d u c e d   h e a t i n g   c a p a c i t y 

Heating Operation 

When connecting the unit to the mains 
socket make sure to observe the right 
polarity. 
If the unit is switched off due to a fault 
during the starting phase, the  mains 
plug has to be turned by 180°.

 

The unit runs in continuous operation.  

 
Plug the supplied bridge plug (1) into 
the thermostat socket (2). 

1) Heating Without Room Thermostat 

The unit operates fully automatically 
and dependent from the temperature.  

 
Remove bridge plug (1) and plug ther-
mostat plug (3) of the room thermo-
stat (accessories) into the thermostat 
socket (2). 

Preselect desired room temperature 
on the room thermostat. 

 
The selected temperature must be 
higher than the actual room tempera-
ture. 

2) Heating With Room Thermostat 

Plug mains plug into a properly installed mains socket. 
(230V/1 – 50Hz 

with fault current breaker!)

 

Switch operating switch into “I” 
position (= heating operation). 

The ingoing air fan starts and the automatic burner 
carries out the programme flow.  

 
After approx. 15 seconds formation of the flames starts. 

3)  How to Start the Unit 

G

 

Summary of Contents for PGT 100

Page 1: ...REMKO strong as a bear Propane Heater REMKO PGT 30 PGT 100 Edition GB L07 Operation Technology Spare Parts...

Page 2: ...Drawing PGT 100 12 List of spare parts PGT 100 13 Block diagrams 14 Technical data 15 G Always keep these operating instructions near or on the device G PGT 100 PGT 30 PGT 60 Mobile Propane Heaters O...

Page 3: ...ted only by those persons who have been instructed regarding the unit s operation and the handling of liquid gas When using the unit make sure always to obser ve the guiding principles of the countrie...

Page 4: ...constant unit connection pressure of 1 5 bar 1500 mbar must be ensured also during con tinuous operation G 1 2 Install only in well ventilated rooms not in rooms which people will be using for longer...

Page 5: ...you use a bottle battery consisting of at least 3 bottles All bottle valves must be open to ensure regular gas supply T connection high pressure hose 0 4 m pressure controller hose break protection g...

Page 6: ...ed set or repai red the gas supply has to be cut off and the mains plug has to be unplugged from the mains socket Setting and maintenance work is to be carried out only by authorized specialists Any o...

Page 7: ...rode incorrectly set Set according to instructions check porcelain insulation of electro des 9 Suction protective lattice of air supply fan is dirty Clean suction protective lattice 10 switching off b...

Page 8: ...8 We reserve the right to make modifications in dimensions and construction in the interests of technical progress Drawing PGT 30...

Page 9: ...37 clutch disc 38 gas burner 39 protection socket 40 retaining bracket not shown pressure controller with hose break protection 2 running metres gas hose 2 running metres HD gas hose for building sit...

Page 10: ...10 Drawing PGT 60 We reserve the right to make modifications in dimensions and construction in the interests of technical progress...

Page 11: ...t 1101197 30 solenoid valve 1101376 31 thermostat socket 1101018 32 shunt plug 1101019 33 gas connection nipple 3 8 lks 1101134 34 control knob cpl 1101192 36 traction relief 1101267 37 operating swit...

Page 12: ...12 Drawing PGT 100 We reserve the right to make modifications in dimensions and construction in the interests of technical progress...

Page 13: ...er 28 tube fitting M10 x 1 29 gas pipe R D Fig No Description 30 support bracket rear 31 operating switch 32 traction relief 33 connecting cable with plug 34 shunt plug 35 thermostat socket 36 control...

Page 14: ...de ZT ignition transformer Block Diagram PGT 100 HS auxiliary relay I ionisation electrode KL terminal strip M fan motor MV solenoid valve NK after cooling thermostat RS burner relay socket RT room th...

Page 15: ...uring DIN 45635 01 KL 3 Technical Data Automatic burner relay Working voltage 230 V 15 10 Frequency 50 Hz 40 60 Hz Safety time 5 seconds Waiting time after interference cut off ca 60 seconds Allowable...

Page 16: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage Postfach 1827 Telefon 0 52 32 606 0 Telefax 0 52 32 606260...

Reviews: