8
Shutdown
Temporary shutdown
Temporarily shutdown the plant as follows:
1.
Completely switch off the electrical connec-
tion.
2.
Drain the storage tank in areas where it is at
risk from frost and before the onset of winter.
3.
In this case also drain the cool and hot water
pipes leading to the heating unit and to the
heat/cold generators as well as water car-
rying fittings and pipes (also heating cycle =
radiator) to the frost-proof part of the
domestic water system (domestic water con-
nection).
Permanent shutdown
Ensure that units and components are disposed of
in accordance with local regulations, e.g. through
authorised disposal and recycling specialists or at
collection points. REMKO GmbH & Co. KG or your
contractual partner will be pleased to provide a list
of certified firms in your area.
CAUTION!
During drainage of the storage tank, hot water
may escape!
NOTICE!
When putting the storage tank back into
service, ensure that it is filled with water and
that water which is free of bubbles is escaping
from the valves!
9
Spare parts list
1
2
3
Fig. 6: Spare parts
We reserve the right to modify the dimensions and
design as part of the ongoing technical develop-
ment process
Spare parts list
No Designation
KPS 130 KPS 300
EDP no.
EDP no.
1
Finned
heat exchanger
---
260200
2
Auxiliary heater
(heating coil 6 kW)
260063
260063
3
Immersion probe
---
259062
4
Cover
---
1108434
When ordering spare parts, please always state
the EDP number, unit number and unit type (see
name plate)!
13
Summary of Contents for KPS 130
Page 15: ......