Type
Version
Diameter (D)
Without air supply
With air supply
Ø duct
□ duct
Ø duct
□ duct
C93
Concentric
60/100 mm
120 mm
120 x 120 mm
120 mm
120 x 120 mm
80/125 mm
145 mm
145 x 145 mm
145 mm
145 x 145 mm
100/150 mm
170 mm
170 x 170 mm
170 mm
170 x 170 mm
6.5.2 Outlets
Drain systems (roof feed-through and outside wall feed-through) must be
supplied by the following manufacturers:
Centrotherm
Cox Geelen
Muelink & Grol
Natalini
Poujoulat
Ubbink
Note
Where regulations stipulate that a wire grille must be fitted, use a
suitable grille made from stainless steel. There must be a mini
mum distance of 50 mm between each part of the outlet and the
grille.
Boiler-specific roof and outside wall feed-through kits are also available.
Note
Contact us for more information.
6.5.3 Length of the air and flue gas pipes
Note
When using bends, the maximum chimney length (L) must be
shortened according to the reduction table.
The boiler is also suitable for longer chimney lengths and diam
eters other than those specified in the tables. Contact us for
more information.
Room-ventilated version (B23, B23P, B33)
Flue gas outlet connection
Air supply connection
With a room-ventilated version, the air supply opening stays open; only the
flue gas outlet opening is connected. This will ensure that the boiler ob
tains the necessary combustion air directly from the installation area.
Caution
The air supply opening must stay open.
The installation area must be equipped with the necessary air
supply openings. These openings must not be obstructed or
shut off.
Tab.11 Maximum chimney length (L)
Quinta Pro
Diameter
80 mm
90 mm
100 mm
110 mm
30
40 m
40 m
40 m
40 m
45
33 m
40 m
40 m
40 m
65
10 m
18 m
27 m
40 m
90
9 m
16 m
24 m
40 m
115
8 m
12 m
19 m
37 m
Fig.13 Room-ventilated version
AD-0000028-01
L =
6 Installation
123157 - v.06 - 24022015
25