6 Installation
6.1 General
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
6.2 Preparation
6.2.1 Positioning the boiler
The fitting bracket on the back of the casing can be used to mount the
boiler directly on the suspension bracket.
The boiler is supplied with a mounting template.
1. Attach the mounting template of the boiler to the wall using adhesive
tape.
Warning
Use a level to check whether the mounting template is hanging
perfectly horizontally.
Protect the boiler against building dust and cover the connection
points for the flue gas outlet and air supply. Only remove this
cover to assemble the relevant connections.
2. Drill 2 holes of Ø 10 mm.
Note
The extra holes are intended for use in the event that one of the
two fastening holes is not suitable for correct fastening of the plug.
3. Fit the Ø 10 mm plugs.
4. Attach the suspension bracket to the wall with the Ø 10 mm bolts
supplied.
5. Mount the boiler on the suspension bracket.
6.3 Water connections
6.3.1 Rinsing the system
The installation must be cleaned and flushed in accordance with BS 7593
(2006).
Before a new CH boiler can be connected to an existing or new installa
tion, the entire installation must be thoroughly cleaned and flushed. This
step is absolutely crucial. The flushing helps to remove residue from the
Fig.7
Mounting the boiler
AD-0000018-01
2
1
5
4
3
6 Installation
123157 - v.06 - 24022015
21