8
Remeha P 520
29/08/05 - 300003791-001-B
Installing the boiler
1 Boiler location
For the assembly and because of their design, P 520 boilers require
no special base. Their closed furnace system means that the floor
need not have refractory properties. All you have to ensure is that the
floor can support the weight of the boiler when it is fitted for operation.
If the boiler location is not determined precisely, leave enough space
around the boiler to facilitate monitoring and maintenance
operations.
Boiler body *
Straight connection (not supplied) *
* 1) In order to facilitate subsequent work on the boiler(replacing the
water distributing tube etc.) use a flanged connection from the boiler
to the system, making sure you comply with minimum clearance
dimension D.
Angled connection (not supplied)
Air inlet
Air outlet
If A = 1.2 m (door opening side), A’ = 0.5 m
If A = 0.5 m, A’ = 1.2 m (door opening side) : adapt the dimensions
on the basis of the dimensions of the burner when the door is open.
B = 1.5 m : adapt the dimensions on the basis of the dimensions of
the burner.
P 520
P 520-13
P 520-15
P 520-17
P 520-19
P 520-21
P 520-23
P 520-25
L
1955
2245
2445
2645
2955
3155
3355
M
275
324
321
299
324
324
303
C min.
300
436
656
656
936
1266
1266
D min.
-
136
356
356
636
966
966