65mm
(CENTRE TO CENTRE)
65mm
(CENTRE TO CENTRE)
65mm
(CENTRE TO CENTRE)
65mm
(CENTRE TO CENTRE)
65mm
(CENTRE TO CENTRE)
65mm
(CENTRE TO CENTRE)
PRIMARY
FLOW
PRIMARY
RETURN
COLD WATER
MAINS
DOMESTIC HOT
WATER
COLD WATER
OUT
SECONDARY
FLOW
SECONDARY
RETURN
TO
P
www.rwc.co.uk/radiance
For technical support call 01386 712400
Reliance Worldwide Corporation (UK) Ltd, Worcester Road, Evesham, Worcestershire, WR11 4RA, UK.
326mm
16
Installing the FFR
Choose a suitable location (usually the utility cupboard) ensuring there is sufficient space to fix
the TIU below where the TIU can be fitted securely to the wall. The TIU is heavy and needs a
sturdy wall and appropriate fixings to support the weight. All pipe connections, apart from the
overpressure relief pipe, are connected at the top.
The box that the FFR is supplied in contains a template which assists the installation. To use the
template:
1. Hold the cardboard fitting template level at the intended location of the TIU.
2. The fitting template can be used to drill pilot holes directly through the red crosshairs or used
to mark the required location of the holes.
3. Insert rawl plugs into the drilled holes.
4.
Partially insert the 2 screws with metal washers into the rawl
plugs and hook the FFR over them.
5.
Tighten the screws with a screwdriver.