
Page 5 of 24
February 2006
Ver 0
4
OPERATOR
INSTALLATION
4.1
Remove control box from mounting bracket, then remove Motor/Gearbox from
bracket
4.2
Prepare header frame Pull system …………………See Page 5
Push system…………………See Page 6
NOTE
NOTE
For push units with a reveal greater than 150 mm refer
to installation sheet included in the extended arm
Packaging.
4.3
Install operator-mounting bracket on the header/frame.
4.4
Install motor/gearbox on operator mounting bracket, then install control box on
bracket Go to wiring page 7
Pull System
Framed Header and Door Preparation