3 PRE-INSTALLATION SITE AND PRODUCT CHECK
3.1
Check that the product model is correct for the required application
3.2
Check that all parts listed for the installation are received
3.3
Check architectural drawings and final approved shop drawings for position of
frame and structural openings
3.4
Check header and frame dimensions and required clearances
Clearances for pull system
Clearances for push system
3.5
Ensure door weights is less than 90Kgs for heavier doors, consult supplier
3.6
Check that a 240 Volt, single phase, 60 Hz, fused supply (5 amp fuse maximum) is
available at the side of the jamb within approximately 1 Meter of the header.
Approved type conduit is recommended for 240V systems
3.7
The supply must be a dedicated circuit from the main circuit breaker panel and must
not be connected into building lighting circuit with fluorescent lights