background image

Intended Use

This product is intended to be used for; the lifting 
of goods, or the lifting of persons providing there 
is no risk of a fall.

This product provides a safety anchor point on the 
column for the prevention of falls of the person 
operating the davit only.

It is expected that all users of this product have the 
necessary medical and physical capabilities, are fully 
trained and competent in its safe assembly and use.

Correct Operation

Inspection Prior to Initial Operation

Each product must be inspected prior to initial 

operation by a competent person to ensure that the 

structure is safe and that it has not been damaged 

by incorrect assembly, transport or storage. 

Inspection Before Starting Work

Before starting work, the product assembly and 
all load-bearing components should be checked 
for visual defects as per the inspection checklist on 
page 8.

Maximum Capacity

Goods Lifting:

 This product is designed to lift 

and lower loads up to its rated capacity. Do not 
exceed the capacity indicated on the product.  

Personnel Lifting: 

When lifting people, the 

overall load limit is reduced by half to provide an 
increased safety factor.  The maximum capacity 
permitted by the personnel winch/accessory used 
in conjunction with the product also needs to be 
taken into account. 

If this product is to be used for lifting or lowering 
a person where there is a risk of a fall, then 
a secondary line/fall arrest unit is required, 
connected to a separate structure which meets 
the requirements of OSHA 1926 Subpart M.

Only chain hoists with a capacity of up to 2200lb 
are suitable for this product. The structure has 
been designed to take into account the weight 
of a standard chain block but, if a device with 
a significant additional weight is being used, 
then this needs to be included within the overall 
capacity. Care should also be taken when using 
any lifting device other than a manual chain 
hoist in case the dynamic effects of this reduce 
the overall capacity of the davit. REID Lifting’s 
representatives can provide additional advice on 
this if required.

Please be aware that the maximum reach is 
achieved when the davit is being used at 
approximately 75% of its maximum capacity.

Summary of Contents for T DAVIT

Page 1: ...US REIDLIFTING COM Assembly Operation Guide TDAVIT...

Page 2: ...ections Maintenance Repair Storage Transportation Sockets Socket Installation Minimum Mounting Requirements Verifying the Installation ATEX 12 ATEX Classification Zone 2 Classification Zone 1 Spark Fo...

Page 3: ...apply for Operation including preparation troubleshooting during operation and cleaning Maintenance inspection and repair Transportation It is the responsibility of the end user to adhere to the Healt...

Page 4: ...city indicated on the product Personnel Lifting When lifting people the overall load limit is reduced by half to provide an increased safety factor The maximum capacity permitted by the personnel winc...

Page 5: ...ecommend that gloves are worn when using the equipment Attach the hoist to the dedicated lifting point only making sure it is attached in a way that does not expose the user to danger by the hoist cha...

Page 6: ...uch as trapping fingers in rotating parts Be aware of any adverse weather conditions such as strong or gusty winds which could impose additional horizontal loads and affect the stability of the struct...

Page 7: ...on climatic exposure on the fall protection lifelines and the effect of offset forces as a result of pendulum falls Where regulations require each installation must be approved by a qualified person W...

Page 8: ...sh with the top of the socket Regular Inspections To ensure that the product s remains in safe working order it must be inspected regularly by a competent person We recommend inspections every 6 month...

Page 9: ...equipment in a clean and dry manner Cleaning is suggested using a sponge or cloth with warm soapy water rinsing and allowing to dry This product must be assembled using metric fixings of the same typ...

Page 10: ...into new concrete or resin bonded into existing concrete Socket Installation Socket installation should only be carried out by a qualified person with the ability to specify the anchors resin and fas...

Page 11: ...n verifying the installation testing should be to no more than 125 of the goods capacity at its maximum reach All tests should be carried out in all anticipated worst case loading directions sustained...

Page 12: ...ures are unlikely to occur or if they do occur are likely to do so only infrequently and for a short period only The product will have the following identification on the serial label As Standard for...

Page 13: ...hing cable should be used Inspection Maintenance Repair Special attention should be given to dust deposits on the structure especially in areas where the profiles come into contact and should be wiped...

Page 14: ...Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application The T DAVIT shown is a winched version but an unwinched variant is also available Appropriate PPE should be worn Glo...

Page 15: ...p Present the beam to the chosen location and insert the clevis pin The T DAVIT beam can be assembled at 2 positions as shown Ensure the correct set up is chosen at this stage 15 TDAVIT Assembling the...

Page 16: ...ert the clevis pin to take the weight of the beam Secure the pin with the R clip For disassembly reverse steps 1 9 In some circumstances the winch can be used to rotate the beam in line for the pin in...

Page 17: ...17 TDAVIT Variants Options Type VW...

Page 18: ...ay vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application Appropriate PPE should be worn Gloves Protective Footwear Hard Hat Assembly Instructions Socket Top...

Page 19: ...vent the beam from disengaging Place the winch and bracket in position Place winch attachment column to the beam as shown Secure attachment with the nuts and bolts supplied 19 TDAVIT Assembling the T...

Page 20: ...lied Thread the rope over the sheaves The rope retaining pins need to be removed before fitting the rope Reinsert pins ensuring they are secure Please refer to the Operating manual of the winch before...

Page 21: ...21 TDAVIT Variants Options Type T...

Page 22: ...extension is optional and the socket type may vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application Appropriate PPE should be worn Gloves Protective Footwe...

Page 23: ...Reinsert bolt and spacer ensuring they are secure Insert T Davit column into the socket Thread beam trolley over the end of the beam Lock trolley with friction brake at approximately centre position 2...

Page 24: ...e pin with retaining R clip The T Davit is now erect Rotate the beam as illustrated Insert rear clevis pin Present the beam to the column and insert clevis pin to take the weight of the beam Assembly...

Page 25: ...Release trolley brake Use the hand chain to move the trolley along the beam 25 TDAVIT 12 13...

Page 26: ...Variants Options...

Page 27: ...e configuration users can experience a maximum effort of 78lb The rotation should be done in a controlled manner When the rotational handle is attached to the Davit the following points must be observ...

Page 28: ...n A Height of Lift Position B Winch Position 1 Winch Position 2 Winch Position 3 Winch Position 4 Winch Position 5 Height of Pin Position 1 Height of Pin Position 2 A W1 W2 W3 W4 P1 W5 P2 B C D TDAVIT...

Page 29: ...D C D Weight lbs Winch Position P1 P2 3 52 64 52 67 N A N A 51 W1 7 58 61 W2 12 W3 24 W4 29 W5 34 4 N A N A 64 80 64 86 55 W3 24 70 74 W4 29 W5 34 Beam Option 1 2 3 BEAM LENGTH 57 65 80 DIMENSION A B...

Page 30: ...ions Radius Position A Radius Position B Height of Lift Position A Height of Lift Position B Height of Pin Position 1 Height of Pin Position 2 A P1 P2 B C D TDAVIT D C B A P1 P2 Type S Position A Posi...

Page 31: ...7 N A N A 51 W1 7 58 61 W2 12 W3 24 W4 29 W5 34 4 N A N A 64 80 64 86 55 W3 24 70 74 W4 29 W5 34 Beam Option 1 2 3 BEAM LENGTH 57 65 80 DIMENSION A B A B A B REACH 33 30 41 37 57 52 LOAD RATING lbs 11...

Page 32: ...nt environmental issues and the health and safety practices within the company ISO 9001 2015 Quality management system which assesses an organization s ability to consistently provide products that me...

Page 33: ...ile review are integral parts of our design and manufacturing process External verification of products is undertaken where appropriate using government approved Notified Bodies All products have been...

Page 34: ...Product Labelling Product labelling The following labels must be present on the product and must be legible lbs 1 2 3 4 6 3 3 4 6 5 1 2 5 2 1...

Page 35: ...rial number The goods capacity WLL of the device The year of manufacture The standards to which the device is approved The ATEX rating of the product if applicable CE Marking Minimum braking load MBL...

Page 36: ...com Printed using environment friendly processes and materials All information herein is copyright protected by REID Lifting Ltd All company and product names are Trade Mark and Trade Name protected a...

Reviews: