background image

REGULUS - R2GC storage water heaters - www.regulus.eu

6 - Installation and Commissioning

Installation must meet valid rules and may be done only by quali

fi

ed staff. The tank shall be placed on the 

fl

oor, as close to the heat source as possible.

Warning: Defects caused by improper installation, use or handling are not covered by warranty.

6.1 - Connection to heat sources

Connect heating circuits to the inlets to and outlets from heating coils. The heat source for the tank - 2 enam-
eled coils - connects with G 1” coupling.

6.2 - Connection to a solar system

The tank can be used with a solar system. In such a case, the inlet for hot heat-carrying liquid coming from the 
solar system shall be connected to the G 1” upper sleeve of the lower heating coil and the lower outlet to the 
return piping to the solar system. Insulate all the piping between the tank and the solar system.

6.3 - Heating rod installation

The G 6/4“ side sleeve is designed to accommodate an electric heating rod. Heating rods of output up to 6 kW 
can be used (depending on the tank diameter and rod length), connected either directly to the mains (thermo-
stat-equipped rods), or to a heating system controller. The installation may be done by quali

fi

ed staff only.

Warning: Electric heating elements shall be protected by a safety thermostat.

6.4 - Connection to water mains

DHW piping shall be done according to valid rules. G 1” threaded couplers are used to connect the tank to 
a cold water inlet and hot water outlet. A 6bar safety valve shall be installed at the cold water inlet, installa-
tion of a reducing valve is recommended. If the pressure from water mains exceeds 6 bar, a reducing valve is 
necessary. In order to prevent water loss, an expansion tank should be installed at the cold water inlet as well 
(8l volume for R2GC 200, 250 and 12l volume for R2GC 300 and 400).
Should the water be too hard, install a water softener before the tank. In case the water contains mechanical 
impurities, install a strainer.
A suitable thermostatic mixing valve should be installed at the hot-water outlet from the tank, preventing too 
hot water from entering the taps. 
Install a drain valve to the lowest point of the tank.
Complete DHW piping shall be properly insulated.

6.5 - Electronic anode rod installation

So called electronic anode can be used instead of the magnesium one. Its principle advantage is that its 
proper function is signaled by a control lamp while a magnesium anode rod needs to be taken out for check. In 
such a case, just visual check of the electronic anode is suf

fi

cient. 

Please use a G 5/4” to G ½” reducing coupler when installing an electronic anode. In order to protect the tank 
properly and meet its warranty conditions, select an anode from the table below. A space of about 0.5 m is 
needed between the tank top and ceiling to install/exchange the electronic anode rod (0.35 m for R2GC200).

Kit for R2GC storage water heaters 

 

Code

Anode rod length [mm]

For storage water heaters

9176

350 (200/150)

R2GC 200

9177

500 (350/150)

R2GC 250, R2GC 300, R2GC 400

Summary of Contents for R2GC 250

Page 1: ...R2GC 200 R2GC 250 R2GC 300 R2GC 400 STORAGE WATER HEATERS EN v 1 1 Users Manual Date of manufacture Serial number Checked by...

Page 2: ...3 Technical Data and Dimensions of R2GC Tanks 4 4 Operation 5 5 Examples of Assigning Connection Points 5 6 Installation and Commissioning 7 6 1 Connection to heat sources 7 6 2 Connection to a solar...

Page 3: ...d it guarantees a long serv ice life The magnesium anode rod shall be inspected regularly see point 7 Maintenance Replacement of Magnesium Anode Rod An electronic anode can be also used its lifetime c...

Page 4: ...5 upper heating coil kW 24 2 34 6 38 1 45 Flow rate l h 600 850 940 1110 Heating water needed m3 h 2 7 2 85 3 0 3 0 h1 mm 210 130 210 240 h2 mm 290 210 290 320 h3 mm 400 355 440 570 h4 mm 570 520 580...

Page 5: ...ystem R2GC HW CW recirculation E E gas boiler T bb bb bbb bbb B bbb bbb Conn point Example I with a gas boiler Example II with a boiler and accum tank G 5 4 upper flange magnesium anode magnesium anod...

Page 6: ...solar system and accumulation tank boiler PS R2GC HW CW recirculation E E T bb bb bbb bbb B bbb bbb Table of limit values for total dissolved solids in hot water Description pH Total dissolved solids...

Page 7: ...d to connect the tank to a cold water inlet and hot water outlet A 6bar safety valve shall be installed at the cold water inlet installa tion of a reducing valve is recommended If the pressure from wa...

Page 8: ...n anti corrosion sacrifice magnesium anode rod The anode rod shall be checked within 6 months after commissioning and subsequently always not later than 6 months after the last check If more than 1 3...

Reviews: