27
16. DESCRIPTION OF PROCEDURES FOR ANNUAL PREVENTION CHECKS
Warning:
Prevention examination and eventual
intervention may be carried out by a qualified
person only. Any work on electric wiring may
be done by an authorized electrician. Maximum
care shall be taken during checks. In case the
procedure requires a person to get on a roof, a fall arrest
is necessary.
Check procedures
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Check the pressure in expansion vessel, replenish if necessary
Check system visually for leaks
Check the collector glazing cleanness, wash if necessary
Check ambient trees for possible shading
Check
pipe
insulation
Check the proper flow rate
Check
temperature
probes
Check the quality of antifreeze liquid (with a refractometer)*
Check the heat carrier pressure, replenish if necessary
Check the controller settings
Check for possible error messages in the controller and their reason
Check
wiring
Check backup heating function (el. heating rod, gas-fired boiler)
Check the magnesium anode rod in the tank, substitute if necessary
(see
Instruction
Manual)
Check the function of all system valves and fittings
Check the collector fastening
If needed, check the pressure in the heating system expansion vessel
If needed, clean the filter and de-aerate the heating system
Preventive training in system maintenance and controller setting
for the operating staff
*If the test result shows the necessity, fill new heat carrier.
Summary of Contents for KPG1H-ALC
Page 26: ...26 85 2150 1170 70 ø22 2193 21 5 15 CONNECTION DIMENSIONS ...
Page 28: ...28 ...
Page 30: ...30 ...
Page 31: ...31 ...