11
• Insert nuts into both the rails (Fig. 13). Put the retai-
ning side brackets on the rails and fasten the collector
using M8x16 bolts.
• Lay the following collector next to the first one, mainta-
ining a sufficient gap. Then put on the threaded fittings
(Fig. 14, pos. 9) and push the collector to the already
mounted one until stop. Hold the fitting with a spanner
to prevent turning and tighten the nuts. More on this in
chapter
5 Hydraulic Connection
.
• Continue mounting further collectors in the same way
(see page 14).
48
6
7
5
For passing the connection pipes through a roof
e.g. ventilation tiles can be used, where the hole
is modified according to the diameter of the pipe
with insulation. Anyway standards of the roofing
manufacturer shall be respected for pipe passage
through a roof.
3. CONNECTION PIPE PASSAGE THROUGH A ROOF
5 – M8 nut for rail
6 – M8x16 allen head bolt
7 – Retaining bracket
Fig. 13: Fitting the retaining brackets
Fig. 13b: Pipe passing through ventilation tile
Summary of Contents for KPG1H-ALC
Page 26: ...26 85 2150 1170 70 ø22 2193 21 5 15 CONNECTION DIMENSIONS ...
Page 28: ...28 ...
Page 30: ...30 ...
Page 31: ...31 ...