background image

6

Assembly instructions

General and transport instructions

The mounting system is suitable for tiled roofs only. Installation must only be carried out by quali

fi

 ed personnel. The entire 

information in these instructions is intended exclusively for such quali

fi

 ed personnel. Only the supplied material should be 

used for the installation. Prior to starting installation and operation of the solar collector system, please inform yourself about 
the applicable local standards and regulations. The use of a carrying strap is recommended for transporting the collector. 
The collector must not be lifted at the connections or on the threading. Avoid impacts and mechanical in

fl

 uences on the 

collector, in particular on the solar glass, the rear panel and pipe connections.

Statics - tiled roofs

The collectors may only be mounted on suf

fi

 ciently load-bearing roof surfaces and substructures. It is imperative that the static 

load bearing capacity of the roof or substructure is checked in terms of local and regional conditions prior to installation of the 
collectors by the customer, if necessary through the involvement of a structural engineer. Particular attention should be paid to 
the quality of the (timber) substructure in terms of the stability of the screw connections necessary for fastening the collectors. 
The checking of the entire collector structure by the customer as per DIN 1055 part 4 and 5 or as per the applicable country-
speci

fi

 c regulations is particularly important in areas with heavy snowfall (note: 1 m³ powder snow ~ 60 kg / 1 m³ wet snow ~ 

200 kg) or in areas exposed to high wind speeds. The assessment should also take into account any particular circumstances 
at the place of installation (foehn wind, air jets or eddy formation etc.) which can lead to increased loads. When selecting the 
installation site it should be ensured that the maximum load is not exceeded either by snow or wind forces. As a rule, collector 
arrays must be installed such that any possible collection of snow is prevented from reaching the collectors by snow barriers 
(or through special forms of installation). The distance to roof ridges/edges must be at least 1 m. Max. wind speed 150 km/h 
and max. snow load 1.4 kN/m

2

Note: Installing a collector array signi

fi

 es an intervention into an (existing) roof. Roof coverings, e.g. tiles, shingle and slate, especially in 

the case of converted and inhabited loft spaces or roofs with less than the minimum slope (with regards to the covering) require additional 
measures by the customer, e.g. sarking membranes, as security against water penetration caused by wind pressure and driving snow.

Lightning protection / Equipotential bonding of the building

For installations of solar collectors, the standard for lightning protection EN 62305 Part 1-4 shall be respected.

Connections

Depending on the design, the collectors must be connected with one another and/or the connection pipes using screw 

fi

 t-

tings (G1“ internal/external thread) with 

fl

 at-face sealing. Ensure correct placement of the 

fl

 at gaskets. If 

fl

 exible pipes are 

not used as connectors, precautions must be taken to protect the connection pipes against temperature 

fl

 uctuations caused 

by heat expansion, e.g. expansion bends and 

fl

 exible piping (see Connecting the collectors to one another/Operational 

recommendations). Larger collector arrays must be assembled with expansion bends or 

fl

 exible members inserted in the 

links. (IMPORTANT: check the pump design). When tightening the union nuts, always balance (counter) the torque with a 
pipe wrench or another spanner to prevent damage to the absorber.

Collector inclination / General notes

The collector is suitable for angles between 20° (minimum) and 65° (maximum). The collector must be installed so that rear 
ventilation for preventing the diffusion of moisture in the collector is guaranteed. The collector connections and the ventila-
tion openings must be protected against the penetration of water as well as contamination such as dust etc.

Cleaning

Clean the water courses of the sheet metal edging at least once per year (or more often if required).

Legal guarantee

Legal guarantee claims can only be made if the supplier‘s own antifreeze has been used and maintenance has been carried 
out correctly. Installation by quali

fi

 ed personnel with absolute adherence to the instructions is a prerequisite for the justi

fi

 -

cation of claims.

Summary of Contents for Ashburn KPI1

Page 1: ...EN ver 1 1 Installation and Operation Manual KPI1 Inroof Solar Collector 6904180...

Page 2: ...ly components or the resulting consequences Figures and illustrations used Due to the possibility of setting and printing errors and to the need for continuous technical change please understand that...

Page 3: ...rmation 4 Transport note 5 Assembly instructions Collector 6 Overview of tools 7 Overview of materials 8 Inroof mounting 10 Sugenstion for attachment points 21 Technical data Collector 23 Connection d...

Page 4: ...ing them off the prescribed safety distances are maintained Voltage radius 3 m 1000 11000 V 4 m 11000V 22000 V 5 m 22000 V 38000 V 5m in case of unknown voltages The manufacturer hereby guarantees to...

Page 5: ...5 Transport note ATTENTION Do not lift collectors by the connections or the screw threads...

Page 6: ...rms of installation The distance to roof ridges edges must be at least 1 m Max wind speed 150 km h and max snow load 1 4 kN m2 Note Installing a collector array signifies an intervention into an exist...

Page 7: ...7 Overview of tools Measuring tape Drill Cross bit Pz 2 Torx bit TX 15 Hex spanner Water pump pliers Angle grinder Hammer...

Page 8: ...Attachment bracket Self trapping screws 5x60 5x40 Connecting bend Flat gasket Front corner section right left or middle Side piece right left Side tin cover strip Sealed plumping screw 4 5 35 Middle...

Page 9: ...materials Self tapping screws 6x120 Side piece connector right left Middle cover right left or middle Rear corner section right left or middle Self tapping screws 4x25 Metal retainer roofingnail Foam...

Page 10: ...eight approx 3 0m for single row installation Height approx 5 0 6 0m for double row installation 2a Attach the installation batten below screws 5x60 2b Measurement A 80mm for tile sheet metal edging M...

Page 11: ...ctor glass screws 5x40 If necessary install upper installation batten screws 5x60 3 Fasten the attachment bracket on the installation batten as shown on the attachment diagram page 25 screws 5x40 4 Se...

Page 12: ...integrated connection set 8a 8b Alternative Create a Cu connection using a soldered connection Install the sensor with the sensor tube extension at the forward flow 9 Install the installation batten...

Page 13: ...nt diagram page 25 screws 5x40 11 Set and align the second row of collectors 11a secure them using the lower 11b or upper attachment bracket screws 5x40 If necessa ry install upper installation batten...

Page 14: ...t into the required nut of the glass lower bar Note Before installing the underside of the metal casing remove the collectors lower protection piece 13 Slide the lower section into the middle 14 Slide...

Page 15: ...stall the side piece connector on the right and left Repeat steps 16 17 19 20 21 and 22 for the second collector row accordingly 16 Install the side pieces on the right and left Upper edge of the shee...

Page 16: ...section on the right and left at the collector using sealed plumbing screws 4 5x35 21 Push the middle cover strip between adjacent collectors from the bottom as far as it can go 22 Tighten the middle...

Page 17: ...e cover to the side tin cover strip and the collector on the required position using a sealed plumbing screw 4 5x35 23 Slide in the middle cover on the left 24 Slide in the middle cover to the centre...

Page 18: ...e left upper corner secti on 27b in the collector 28 Tighten the left upper corner section outside of the reinforcing seam on the wooden wedge screws 4x25 29 Hang the middle upper section in the colle...

Page 19: ...ht upper section in the collector and connect it to the mid dle upper section 31 Tighten the upper section on the left and right side to the cover strip and the collector using a sealed plumbing screw...

Page 20: ...The top projecting end of the tile must be 80 and 140mm over the metal edge 35 Finally adjust the lead skirting for sheet metal edging with tile roofs only to the contour of the tile 36 Note When inst...

Page 21: ...xed to the extra slats with 3 self trapping screws 5x40 The collector inclusive roof mountings are suitable of withstanding a maximum gust of wind V of 150km h and of a maxi mum characteristic snow lo...

Page 22: ...ixed to the extra slats with 3 self trapping screws 5x40 The collector inclusive roof mountings are suitable of withstanding a maximum gust of wind V of 150km h and of a maxi mum characteristic snow l...

Page 23: ...ut the collector 1130 2 2 0 0 5 5 8 8 2 2 1 1 0 0 4 4 1 12 22 27 7 1 10 05 5 Technical data Gross surface area m 2 52 Weight kg 47 Net surface area m 2 28 Fluid volume l 1 7 Aperture m 2 32 Max workin...

Page 24: ...24 Connection diagram Connecting bend Installation battens Attachment brackets...

Page 25: ...ucting compound All materials used for installing temperature sensors sensor element conducting compound cables sealing and insulating materials must be suitably temperature resistant up to 250 C Oper...

Page 26: ...array size m2 5 7 5 10 12 15 20 25 Pipe diameter copper mm Cu15 Cu18 Cu22 Cu28 Stain less steel corrugated pipe diameter DN16 DN20 DN25 Mass flowrate kg h 0 50 100 150 200 250 300 350 400 450 500 Pre...

Page 27: ...27 Notes...

Page 28: ...02 2012 REGULUS spol s r o Do Kout 1897 3 CZ 143 00 Praha 4 http www regulus eu E mail sales regulus cz...

Reviews: