13
Inroof-mounting
10: Fasten the attachment bracket on the installation batten as shown on
the attachment diagram (page 25), screws 5x40
11: Set and align the second row of collectors (11a), secure them using
the lower (11b) or upper attachment bracket, screws 5x40. If necessa-
ry, install upper installation batten, screws 5x60.
Hydraulically connect the second row of collectors as shown in point
7 and 8.
9b
10
11a
11b
Summary of Contents for Ashburn KPI1
Page 1: ...EN ver 1 1 Installation and Operation Manual KPI1 Inroof Solar Collector 6904180...
Page 5: ...5 Transport note ATTENTION Do not lift collectors by the connections or the screw threads...
Page 24: ...24 Connection diagram Connecting bend Installation battens Attachment brackets...
Page 27: ...27 Notes...