18
Inroof-mounting
27: Place the wooden wedge in the middle above the collector and tighten
it on the roof structure, screws 5x120. Hang the left upper corner secti-
on (27b) in the collector.
28: Tighten the left upper corner section outside of the reinforcing seam
on the wooden wedge, screws 4x25
29: Hang the middle upper section in the collector and connect the upper
left corner section. Tighten the sheet metal outside of the reinforcing
seam using a screw 4x25.
27a
27b
29
28
Summary of Contents for Ashburn KPI1
Page 1: ...EN ver 1 1 Installation and Operation Manual KPI1 Inroof Solar Collector 6904180...
Page 5: ...5 Transport note ATTENTION Do not lift collectors by the connections or the screw threads...
Page 24: ...24 Connection diagram Connecting bend Installation battens Attachment brackets...
Page 27: ...27 Notes...