background image

Hydraulically foldable devices consist of a central load-bearing main frame with a 3-point connection for the tractor hitch and two hy-

draulically foldable tine frames. When folded up, the tine frames must always be secured against unintentional opening, for this purpose 
a mechanically operated shut-off valve is installed on the hydraulic coupling plug of the corresponding control circuit. In the special 
equipment variant „remote-operated shut-off valves“, permanently locked shut-off valves are installed on the two hydraulic cylinders, 
which can be opened by pulling the unlocking rope. As soon as the unlocking rope is released, the valves automatically switch to the 
locked state.

HYDRAULIC FOLDING MECHANISM

(TERRAKAN 5000, TERRAKAN 6000)

Make sure that the hydraulic control circuit is only unlocked for the active folding process.
For safety reasons, the folding mechanism must be locked during transport and field work.

 

¾

Make sure that there are no people / animals in the danger 

area.

 

¾

Only approach the device when the hitch is lowered and the 

device stands securely on the ground.

 

¾

Open the shut-off valve on the hydraulic coupling plug.

 

¾

Lift the device at least one meter off the ground via hitch.

 

¾

In  the  case  of  devices  with  chassis,  lift  the  tractor‘s  hitchin  in 
addition to the hitch system of the device.

 

¾

Make sure there is sufficient space between the machine com

-

ponents and the ground during the entire folding process. Vari

-

ous components can be severely damaged in a collision.

 

¾

With the „remote-operated shut-off valves“ equipment, the un

-

locking rope must be pulled during the entire folding process.

 

¾

Apply pressure to the hydraulic control unit until both tine fra-

mes are lowered and have reached the end position.

 

¾

After the folding process, lock the hydraulic circuit using a shut-

off valve (if the option remote-operated shut-off valve is instal-

led, the device is automatically secured against unintentional 
opening as soon as you release the actuating rope).

 

¾

Make sure that there are no people / animals in the danger 

area.

 

¾

Only approach the device when the hoist is lowered and the 

device stands securely on the ground.

 

¾

Open the shut-off valve on the hydraulic coupling plug.

 

¾

Lift the device at least one meter off the ground via hitch. 

 

¾

In  the  case  of  devices  with  chassis,  lift  the  tractor‘s  hitchin  in 
addition to the hitch system of the device.

 

¾

Make sure there is sufficient space between the machine com

-

ponents and the ground during the entire folding process. Vari

-

ous components can be severely damaged in a collision.

 

¾

With the „remote-operated shut-off valves“ equipment, the un

-

locking rope must be pulled during the entire folding process.

 

¾

Apply pressure to the hydraulic control unit until both tine fra-

mes are fully raised and have reached the end position.

 

¾

After the folding process, lock the hydraulic circuit using a shut-

off valve (if the option remote-operated shut-off valve is instal-

led, the device is automatically secured against unintentional 
opening as soon as you release the actuating rope).

Unfold the device

Fold up the device

TRANSPORT POSITION & WORKING POSITION

Before switching from field work to road transport, some machine elements have to be brought into the transport position in order to adjust 
the width and height of the device to the requirements of road transport.

 

¾

Fold the side plates into the transport position (see chapter side 

shields).

 

¾

Fold the side levelling tines into the transport position (see chap-

ter Edge levelling tines).

 

¾

In the case of foldable devices, position the front roller so, that 
when the machine is folded, the transport width of the roller it is 
less than the transport width of the tine fields (see chapter front 
roller).

 

¾

In the case of foldable devices, position the vibroboard so, that 
when the machine is folded, the transport width of the vibro

-

board  it  is  less  than  the  transport  width  of  the  tine  fields  (see 
chapter vibroboard).

 

¾

In the case of foldable devices, position the rear roller so, that 
when the machine is folded, the transport width of the rear rol

-

ler it is less than the transport width of the tine fields (see chapter 
roller and straw harrow).

 

¾

Before entering public area, make sure that the control circuit 
for the folding device is locked.

 

¾

Fold the side plates into the working position (see chapter side 

plates).

 

¾

Fold the side levelling tines into the working position (see chap-

ter side leveling tines).

 

¾

Make sure that all bolts are secured with a pin or spring pin 

before starting field work.

Working position

 

¾

For devices with chassis, make sure that the control circuit for 
the hitch system is locked.

 

¾

Make sure that all bolts are secured with a pin or spring pin 

before starting the transport journey.

 

¾

Make sure that the lower links of the towing vehicle have to be 

locked against sideways swinging before transport. The device 

could swing up at higher speeds or when cornering with freely 

swinging lower links.

 

¾

Before driving on public roads, make sure that you comply 
with the country-specific road traffic regulations.

 

¾

Always observe the regulations of the legislator.

Transport position

10

www.regent.at

Summary of Contents for Terrakan 3000

Page 1: ...Cultivator technology Terrakan 3000 5000 6000 Terrakan R6 3000 BIO 5000 BIO 6000 BIO OPERATING MANUAL...

Page 2: ...8 Ballasting 8 Hitch rods 8 Tyres 8 Electric hitch settings 8 COUPLING AND UNCOUPLING 9 CHASSIS COUPLING AND UNCOUPLING 9 HYDRAULIC FOLDING MECHANISM 10 Unfold the device 10 Fold up the device 10 TRAN...

Page 3: ...ons you will be given a handling over declaration Please fill out this document completely and re turn it to Regent within 10 days If you have not received the document please contact your specialist...

Page 4: ...s or orders A Machine model equipment dependent type designation B Serial number five digit identification number C Year of construction regardless of delivery date D Total weight including additional...

Page 5: ...h chemicals e g pickled seeds in the seed box When lifted the lifting struts must be locked to prevent them from swinging sideways if this is violated the ve hicle can swing up when the direction chan...

Page 6: ...nut For broad shares and X35 HM 12 45 172 M5 IGHTENING TORQUE 70 Nm Oval head screw M10x60 with nut For Slim share standard Slim share standard Broad share V220 Broad share B200 Slim share X35 HM Broa...

Page 7: ...and offers significant advantages compared to pure tube bar rollers The numerous partition walls give the roller the necessary stability and in combination with the large sized flange bearings ensure...

Page 8: ...n this way the tire slip can be reduced to a minimum and the electronic hoist control can work correctly Ballasting Correct ballasting reduces tire slippage and thereby also redu cing fuel consumption...

Page 9: ...hen folded the folding system must be locked see chapter folding COUPLING AND UNCOUPLING DEVICE WITH CHASSIS Coupling Make sure that there are no people in the danger zone Select the operating mode po...

Page 10: ...uring the entire folding process Vari ous components can be severely damaged in a collision With the remote operated shut off valves equipment the un locking rope must be pulled during the entire fold...

Page 11: ...area is regu lated by the lifting height of the hitch Make sure that the cylinders of the device s own hitch system are fully retracted in the working position and that the working depth is only regul...

Page 12: ...residues in the area of the left and right outer tines The edge leveling tines are preventing the formation of dams between the lanes on connecting journeys Only adjust the side levelling tines when t...

Page 13: ...do not use the roller to guide the depth of the cultivator in dry and compacted soil structures after harvesting The vibroboard is used to adjust loose soil material and is primarily used on al ready...

Page 14: ...of the device Lubricating plan and lubrication points Every 15 hours of operation until grease emerges from the bearing Cage roller EWK Flange bearing 2 pieces per roller segment Double cage roller Z...

Page 15: ...peligro por rotura de los conductos de fluidos Control seguro En el dimensionamientoy la construcci n de la m quina se han aplicado las siguientes normas EN ISO 12100 Seguridad de m quinas DECLARACIO...

Page 16: ...Regent Pflugfabrik GmbH Bahnhofstr 105 4800 Attnang Puchheim Austria Tel 43 7674 62661 Fax 43 7674 62207 info regent at www regent at...

Reviews: