8
P33CE Direct Vent Gas Fireplace
INSTALLATION
DUCT SYSTEM OPTION
Kit #946-556
The
HeatWave
Air Duct Kit increases the
effectiveness of your fi replace by dispersing warm
air from the fi replace to remote locations in the same
room or other rooms in your home.
Up to two kits may be installed on the fi replace.
Please Note:
Only 1 HeatWave kit may be oper-
ated at one time. This includes the internal blower
option as well.
INSTALLATION
CHECKLIST
1)
Locate appliance
a)
Room
location
(Refer to "Locating Your Fireplace" Section)
b) Clearances to Combustibles
(Refer to "Clearances" Section)
c)
Mantle
Clearances
(Refer to "Combustible Mantels" Section)
d) Framing & Finishing Requirements (Refer
to "Framing & Finishing" Section)
e)
Venting
Requirements
(Refer to "Venting" Sections)
2)
Assemble Top Facing Support and Side
Nailing Strips (Refer to "Unit Assembly Prior
to Installation" Section). NOTE: Must be done
before installing unit into fi replace.
3)
Install vent (Refer to "Venting" Sections)
4)
Make gas and electrical connections. Test the
pilot. Must be as per diagram.
(Refer to "Gas Line Installation" and "Pilot
Adjustment" Section).
Convert to Propane if desired.
(Refer to "Conversion Kit from NG to LPG"
Section).
5)
Install 4-AA batteries into the battery pack or
optional AC power adaptor.
6)
Install standard and optional features. Refer to
the following sections:
a. Optional Brick Panels
b. Log Set Installation
c. Standard Flush Door
d.
Optional
Wall
Thermostat
e. Optional Remote Control
f. Optional Wall Switch
g. Installing the Optional Fan
7)
Final
check.
Before leaving this unit with the customer, the
installer must ensure that the appliance is fi ring
correctly and
operation fully explained to
customer
.
This includes:
1)
Clocking the appliance to ensure the correct
fi ring rate (rate noted on label) after burning
appliance for 15 minutes.
Diagram 1
2)
If required, adjusting the primary air to ensure
that the fl ame does not carbon. First allow the
unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that
causes sooting or carboning that results
in damage is not the responsibility of the
manufacturer.
LOCATING YOUR
FIREPLACE
1)
When selecting a location for your fi replace,
ensure that the clearances outlined on this
page are met.
2)
Provide adequate clearances for servicing.
3)
The appliance must be installed on a fl at,
solid, continuous surface (e.g. wood, metal,
concrete). This may be the fl oor, or raised up
on a platform to enhance its visual impact.
If the appliance is going to be installed on
carpeting, combustible linoleum tile or other
combustible material other than wood fl ooring,
the appliance must be installed on a metal or
wood panel extending the full width and depth
of the appliance.
4)
The P33CE can be installed in a recessed
position or framed out into the room as in A,
B, C, D. See Diagram 1 below.
5)
This appliance is Listed for bedroom
installations when used with a Listed Millivolt
Thermostat. Some areas may have further
requirements, check local codes before
installation.
6)
The P33CE Direct Vent Gas Fireplace is
approved for alcove installations, which meet
the clearances listed on the "Clearances"
Section.
7)
We recommend that you plan your installation
on paper using exact measurements for
clearances and fl oor protection before actually
installing this appliance. Have a qualifi ed
inspector, dealer, or installer review your plans
before installation.
Note: For vent terminations see "Exterior Vent
Termination Locations" Section.
A)
Flat on Wall
B)
Flat on Wall Corner
C)
Recessed into Wall/Alcove
D)
Corner