background image

 

GF40-2 Pellet Stove  |    7

Inside Vertical Installation 

1.  Choose a stove location that is ideal. See the section “

D

eciDing

 

W

here

 

to

 L

ocate

 

your

 P

eLLet

 a

PPLiance

.” 

2.  Place a non-combustible hearth pad where necessary.
3.  Place the unit on the hearth pad (if installed on a combustible 

surface) and space the unit in a manner so when the pellet 

vent is installed vertically, it will be 3” (7.5 cm) away from a 

combustible wall.

4.  Install the tee with clean out.
5.  Install the pellet vent upward from there. When you reach 

the ceiling, make sure that the vent goes through the ceiling 

fire stop. Maintain a 3” (7.5 cm) distance to combustibles and 

keep attic insulation away from the vent pipe. Maintain an 

effective vapor barrier.

6.  Finally, extend the pellet vent to go through the roof flashing.
7.  Ensure that the rain cap is approximately 24” (600 mm) 

above the roof.

1.  Install a tee with clean out on the outside of the house.
2.  Install PL vent upward from the tee. Make sure that you install support 

brackets to keep the vent straight and secure.

3.  Install ceiling thimble and secure the flashing as you go through the 

roof.

4.  Ensure that the rain cap is approximately 24” (600 mm) above the roof.

INSIDE VERTICAL INSTALLATIONS

To accomplish a outside vertical pipe installation, follow steps 1 through 5 in the “

i

nsiDe

 V

erticaL

 i

nstaLLations

 - F

reestanDing

 section and then finish 

it by performing the following (refer to Figure at the bottom of this page).

Outside Vertical Installation

OUTSIDE VERTICAL INSTALLATIONS

Rain cap

Flashing

24"

(61 cm)

5.5"

(14 cm)

Tee with

cleanout

3" (7.5 cm)

Clearance

Support

bracket

Type "PL"

vent

Summary of Contents for Greenfire GF40-2

Page 1: ...mption will vary with the type of fuel used Model GF40 2 Heat Output BTUs 6 881 23 892 BTUs Emissions grams hr EPA Certified 0 54 grams hr Efficiency EPA HHV 80 2 Efficiency EPA LHV 87 4 Flue Size 3 7...

Page 2: ...se dimensions are minimum clearances but it is recommended that you ensure sufficient room for servicing routine cleaning and maintenance A Side wall to unit 8 inches 200 mm B Back wall to unit 5 5 in...

Page 3: ...ond the control of FPI we grant no guarantee against such incidents NOTE Venting terminals shall not be recessed into walls or siding Letter Minimum Clearance Description A 24 in 61 cm Above grass top...

Page 4: ...eople sleep in Outside fresh air is mandatory Secure outside air connections directly to fresh air intake pipe and secure with three screws evenly spaced CAUTION THE STRUCTURAL INTEGRITY OF THE MANUFA...

Page 5: ...ble with high temperature silicone 9 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first...

Page 6: ...allation to use if there is a concrete or retaining wall in line with exhaust vent on a pellet stove The termination must be 12 30 cm from the outside wall and 12 30 cm above the ground Figure 1 Venti...

Page 7: ...apor barrier 6 Finally extend the pellet vent to go through the roof flashing 7 Ensure that the rain cap is approximately 24 600 mm above the roof 1 Install a tee with clean out on the outside of the...

Page 8: ...e chimney Freestanding Hearth Mount Installation Combustible Floor Masonry Fireplace Rain Cap Steel Plate or Flashing Flexible or Rigid 6 Stainless Steel Liner 10 25 4 cm Mantel Minimum 8 20 cm from t...

Reviews: