20
|
E33-10 FPI Direct Vent Gas Insert
|
20
installation
OPTIONAL BACKING PLATE INSTALLATION
1
09.24.14
919-455
Optional Backing plate installation
Faceplate backer
(front side)
Faceplate backer
(front side)
Assembled Faceplate
spacer
(backside)
Spacer
Backing Plate
Backing Plate
(backside)
Backing plate installation with spacer
Backing plate installation without spacer
1.
Install the spacer to the back of the faceplate backing with 6 screws
from the front of the faceplate backing. 2 screws are also required to
secure the top section of the spacer only.
3.
Proceed to faceplate installation–see faceplate instructions in
manual or with faceplate.
2.
Install the custom backing plate to the faceplate backing and spacer
with 9 screws (3 on each side and 3 across the top) installed from
the backside of the backing plate into the backside of the assembled
faceplate backing with spacer as shown below.
2.
Proceed to faceplate installation–see faceplate instructions in
manual or with faceplate.
1.
Secure the faceplate backing to the backing plate with 6 screws in
the locations shown below.
Note:
Insert the screws from the front side of the faceplate backing
using the inner holes.