background image

     

www.reer.it

 

 

8540715  Rev.2 

 

5/8 

 FMC-B / FMC-BR  

COLUMN FOR ADMIRAL/VISION/JANUS LIGHT CURTAINS

 

GENERAL 

These mounting instructions contain information about: 

  The  correct  mounting  of  the  light  curtains 

ADMIRAL,  VISION

  and 

JANUS

  inside  the 

FMC

  or  

FMC-BR 

columns. 

  The assembly of the 

FMC

 or 

FMC-BR

 stand for mounting on the 

FMC-CB/FMC-CBL

 stand bottom.  

  The correct mounting of emitters and receives (with our without mirror).  

  Please  find  detailed  information  about  the  function  of  the  light  curtains  /  light  grids  in  the  relevant 

mounting and wiring instructions.  

MOUNTING ON THE FMC-CB/FMC-CBL STAND BOTTOM (Fig. 1) 

  Mount the 

FMC-CB/FMC-CBL

 stand bottom on the floor (see mounting instruction for stand bottom). 

Please note:  
For  a  correct  alignment,  please  verify  that  the  stand  bottom  upper  surface  is  even  and 
horizontal (using a circular spirit level.) 
To  operate  the  regulation,  act  on  the  three  hexagonal  nuts  B  (fig.4)  until  the  perfect 
levelness is  reached. (Maximum adjustment: 10mm). 
If the ground roughness is over 10mm, flush it adequately. 

 

  Loosen the three allen screws and remove the washers. 

  Assembly the column to the stand bottom, centering the FMC-B column rotation flange with the guides of 

the 

FMC-CB/FMC-CBL

 stand bottom upper plate. 

  Fix the column tightening the three allen screws and the washers.   

 

 

Figure 1 

Summary of Contents for FMC-B2

Page 1: ...CB FMC CBL FIGURA 1 Fissare al terreno la base per colonna FMC CB FMC CBL rif foglio istruzioni della base N B Al fine di ottenere un corretto allineamento verificare che la superficie superiore della...

Page 2: ...l alto facendo in modo che tutte le piastrine precedentemente predisposte entrino nella scanalatura della barriera fig 2 passo3 Raggiunta la posizione desiderata tabella 1 serrare le viti che bloccher...

Page 3: ...per tale controllo si consiglia di utilizzare una livella a bolla posta sul coperchio superiore della colonna A Le regolazioni di livellamento verranno effettuate agendo sui tre dadi esagonali B Alim...

Page 4: ...femmina volante attraverso il raccordo plastico PG11 predisposto nella colonna figura 5 Figura 5 DIMENSIONI Figura 6 RACCORDO PLASTICO PG11 MODELLO FMC B2 FMC B3 FMC B4 FMC B2R FMC B3R FMC B4R QUOTA A...

Page 5: ...ns MOUNTING ON THE FMC CB FMC CBL STAND BOTTOM Fig 1 Mount the FMC CB FMC CBL stand bottom on the floor see mounting instruction for stand bottom Please note For a correct alignment please verify that...

Page 6: ...make sure that all the tapped metal plates slide in the slot on the back of the barrier fig 2 step 3 When correct position achieved see table 1 lock the allen screws to fix the barrier Fix the cover...

Page 7: ...placing a spirit level A on the top end of each stand Perform leveling fine adjustments by means of the hexagonal nuts of the stand bottom B Connect the light curtain the light grid ref Curtain techn...

Page 8: ...ic fitting housed in the column figure 5 Figure 5 DIMENSIONS Figure 6 PLASTIC FITTING PG11 SPIRIT LEVEL MODEL FMC B2 FMC B3 FMC B4 FMC B2R FMC B3R FMC B4R DIMENSION A mm 1000 1200 1330 DIMENSION B mm...

Reviews: