19
Time schedule
Check point/lubricating
point
Method
After first 20 operating
hours
(new or repaired)
Any loose parts around the
PTO.
Secure these parts so that
they cannot come too close
to the PTO.
After every 50 operating
hours.
Lubricate the PTO, roller
bearings and crankshaft
bearings.
Check for loose bolts/nuts.
Connect the machine to the
tractor and leave the machine
running without load for five
minutes.
Replace the oil in the gearbox.
Check the transmission for oil
leaks.
Use EP 2 lubricating grease.
Tighten the loose bolts/nuts
with the correct torque.
Look and listen for any
strange noises and
movements.
Use SAE 140
Replace seals / sealing
paste.
After every 500 operating
hours.
Replace the oil in the gearbox.
Use SAE 140
14.0 EU DECLARATION OF CONFORMITY
We, Redexim, Utrechtseweg 127, 3702 AC Zeist, The Netherlands, declare entirely
on our own responsibility that the product:
VERTI-DRAIN
®
MODEL 7120, WITH MACHINE NUMBER AS INDICATED ON THE
MACHINE AND IN THIS MANUAL,
to which this declaration relates is according to the stipulation of the 2006/42/EC
directive for machines.
Zeist, 01/10/09
A.C. Bos
Manager Operations & Logistics
Redexim Holland