23
x
s
y
23
4-UNPACKING
Technical Dept. - All rights reserved - Reproduction prohibited
To remove the front bracket (fig.3) proceed as follows:
•
open the door
•
remove the screws “
x
”
•
remove the screws “
y
”
•
extract the bracket “
s
”
Install the boiler in the area set aside for it, making sure it conforms to the requirements. The boiler body or unit must always be kept in a
vertical position when moved, and only using suitable lifting trolleys. Pay particular attention to the door and its glass, protecting them
from mechanical knocks that would compromise their integrity.
The product must always be handled with care. If possible, unwrap the boiler near the chosen place of installation. The packaging
materials are neither toxic nor harmful, and therefore no particular disposal measures are required.
The product, as indicated in figure 1 consists of a single packaged unit.
After removing all the packaging, check that the boiler is complete and not damaged. If in doubt, contact the retailer.
Figure 3 - Front bracket
removal