22W LED Emergency Wilson
Bulkhead with Microwave
Sensor Corridor Function
Installation Instructions P.2.
For models: WIL22LEDEMSCF
Testing
The emergency light must be tested and inspected regularly in accordance with local codes of practice. Note: for safety
reasons, tests should be carried out during daylight hours.
The minimum recommended test schedule is as follows:
After installation, allow 36 hours to ensure full battery charge, and then
interrupt the supply; check after 3 hours that the tube is still lighting.
1. Check that the charge indicator LED is working
2. Monthly – interrupt the power supply for a short period and check tube lights
3. Six-monthly – check one hour duration
4. At the end of 3rd year, and annually thereafter – check 3 hour duration: batteries must be replaced when they can no
longer support 3 hour operation.
5. Complete record sheet on installation and retain in maintenance file.
6. Update file with on-going test records for inspection by fire officer or other duly authorised person.
Installation and Maintenance Record
Month
Test
Year 1
Year 2
Year 3
Year 4
Year 5
signed
date
signed
date
signed
date
signed
date
signed
date
1
short
2
short
3
short
4
short
5
short
6
1 hour
7
short
8
short
9
short
10
short
11
short
12
short
x
x
x
x
3 hour
x
x
x
x
x
x
T:
0800 195 0006
F:
0870 043 3946
E:
www.redarrowtrading.com
Red Arrow Trading
Elsworth House, Herries Road South,
Sheffield, S6 1QS