REC Peak Energy Series Installation Manual - UL 1703

Ref: NE-06-03-M 

Rev M - 03.2014

3

iNTroDuCTioN

Thank you for choosing reC photovoltaic panels.  reC Peak energy panels are ideal for delivering long-lasting and reliable power output.  The 

panels have been created through intelligent design and are manufactured to the highest quality and environmental standards.  with correct 

installation and maintenance, reC panels will provide clean, renewable energy for many years.
Please read this entire manual carefully.  it contains critical information on safety, as well as detailed instructions for installation, operation and 

maintenance of this panel.  failure to follow the procedures contained within will invalidate the warranty.  review all instructions and safety notes 

before working on the system.  failure to do so may lead to injury or damage to property.

How to use tHIs manual

This installation manual describes the installation procedures for the mounting of all reC’s ul 1703 certified reC Peak energy series solar 

panels in a photovoltaic array, including panels with a black backsheet and/or a black frame (but excluding reC Peak energy 72 series panels) 

from hereon all referred to as reC Peak energy panels. The drawings within refer to all frame, backsheet and cell color types and are meant to be a 

generic representation of the instructions detailed in the text..  The installed panel is only considered to be in compliance with ul 1703, only when 

mounted in the manner specified by these mounting instructions below.  Note that any panel without a frame (laminate) is not considered to comply 

with the requirements of ul 1703 unless mechanically installed with hardware that has been tested and evaluated with the panel under this 

standard or by a field inspection certifying that the installed panel complies with the requirements of ul 1703.
review the entire manual before installing the panels and ensure you are working from the latest version.  Throughout the manual, you will see the 

below icons which highlight important information or notes:

Indicates potential for damage to the array or property or personal safety.

Indicates important notes on best practice to help with the installation or to avoid potential damage to the panels, array or property.

for further information on installation procedures, please call your distributor or contact your local reC solar office.  Details available at www.

recgroup.com. 

youR ResponsIbIlIty as an InstalleR

installers are responsible for the safe and effective installation and operation of the photovoltaic system and for adhering to all local and national 

standards and regulations.  Prior to installation, check all applicable regulations and permits concerning solar systems and ensure all local 

directives are observed.

• 

ensure the reC panels are in a suitable condition for use and appropriate for the particular installation and environment

• 

use only parts that convene to the specifications set out in this manual

• 

ensure a safe installation of all aspects of the electrical array

All equipment should be properly maintained and inspected prior to use.

suppoRt

Do not attempt to install when you are unsure of the procedure or suitability.  for questions or guidance with your installation, please call your 

distributor or contact your reC sales office, which can be found at: www.recgroup.com/en/contacts.

lIabIlIty DIsClaImeR

reC solar PTe. lTD. accepts no liability for the usability and functionality of its photovoltaic panels if the instructions in this guide are not 

followed.  since compliance with this guide and the conditions and methods of installation, operation, use and maintenance of the panels are 

not checked or monitored by reC solar PTe. lTD., reC solar PTe. lTD. accepts no liability for damage arising from improper application or 

incorrect installation, use, operation or maintenance.  This does not apply to damages due to a panel fault, in cases of loss of life, bodily injury 

or damage to health or in the event of a grossly negligent breach of obligations on the part of reC solar PTe. lTD. and/or in the event of an 

intentional or grossly negligent breach of obligations by a legal representative or vicarious agent.

Summary of Contents for REC235 Series

Page 1: ...InstallatIon manual rec Peak energy series For the installation of panels certified according to UL 1703...

Page 2: ...ireMeNTs 4 meCHanICal InstallatIon 5 fire guiDeliNes 5 orieNTaTioN 5 eNviroNMeNTal faCTors 5 PaNel HaNDliNg 5 mountInG tHe panels 6 PaNel iNsTallaTioN 6 i rail sPeCifiCaTioNs 6 ii ClaMP sPeCifiCaTioN...

Page 3: ...w icons which highlight important information or notes Indicates potential for damage to the array or property or personal safety Indicates important notes on best practice to help with the installati...

Page 4: ...requirements of the NeC the values of isC andvoC marked on the panels must be multiplied by a factor of 1 25 when determining component voltage ratings conductor ampacities overcurrent device ratings...

Page 5: ...th local authorities for applicable regulations concerning setbacks or other placement restrictions that may apply for roof mounted arrays The use of DC ground fault interrupters is recommended This m...

Page 6: ...rails fig 2 Thickness of walls for mechanical connections min 0 156 in 4 0 mm Thickness of walls exposed to buckling load min 0 08 in 2 0 mm Moment of inertia for profile area about x x min array moun...

Page 7: ...1703requirementsforamaximumdesignloadof75 2lbs ft 3600Pa fig 5 when mounting using mounting holes the frame and panel edge must be supported by two transverse rails fig 1 p 8 of aluminium or galvanize...

Page 8: ...reC Peak energy panels utilizing clamps on the two long sides of the panel have been found to be in compliance with ul 1703 require ments for a maximum design load of 75 2 lbs ft 3600 Pa fig 8 Clamps...

Page 9: ...ical integrity of the cables is intact bonding points to ground are tight secure and free from corrosion which could break the continuity between the panels and ground ReCyClInG reC has made every eff...

Page 10: ...normal operation This will help to shield the panel from direct water spray InstallatIon InstRuCtIon i system installation all cables used for the installation must have sufficient length and slack t...

Page 11: ...of the indicated values of isC voC and PMPP under standard test conditions sTC values at sTC airmass aM 1 5 irradiance 1000 w m cell temperature 25 C 77 f at low irradiance of 200 w m aM 1 5 and cell...

Page 12: ...2013 i 2 addition of low watt classes 214 230wp for ul records 04 2013 i 3 update of tightening torque for clamping and mounting holes 06 2013 i 4 update of torque rating for long side clamping and m...

Page 13: ...RECSoLaRPtE Ltd 20tuasSouthavenue14 Singapore637312 Singapore tel 6564959228 Mail post recgroup com www recgroup com...

Reviews: