11
Pyrotech Zero Clearance Installation Procedure
Connect to gas supply.
Connect to power supply
Install flue to 500mm minimum above roof line. (Min total flue run 3.6 m)
Plaster to unit with trim removed.
Install trim.
Assemble unit as per pages 5 - 7.
Test the unit for safe operation and show customer correct operating procedures.
TICK BOXES
PYROTECH ZERO CLEARANCE MODEL
610mm
400mm
280mm
865mm
635mm
675mm
See Inbuilt
model (page 5)
for hole details
Trim
On/Off
Switch
Fan
Switch