background image

6

Pyrotech Inbuilt Installation Procedure

(continued)

Figure (3) Remove nylon grommets and put

aside carefully.

Figure (4) Remove three spacer bolts, and

loosen bolt in bottom right corner.

Figure (5) Support front glass as shown, and

remove fourth spacer bolt. Remove
front glass.

Figure (6) Remove box containing logset, and

unpack. Place the large log at the
rear of the burner just in front of the 2
square tabs on the log support panel.

Re-installation of glass panels is reverse of
above. 

N.B: ensure that the roped edge of

the glass is fitted to the top.

Figure (7) Place the 20 coals on top of the

white ceramic blanket. Ensure front
row of coals are placed 10-12mm
away from the front grille.

Figure (9) Place the 2 straight logs as shown

Figure (8) Place the 2 ‘Y’ shaped logs as

shown, the larger on the left.
Position the ‘Y’ end of the logs
towards the front of the heater.

PYROTECH INBUILT MODEL

NOTE:

Keep coals or pebbles clear
of burner rail.

Summary of Contents for PYROTECH SPACE HEATER

Page 1: ...Pyrotech Space Heater is approved to be installed into a masonry fireplace or as a zero clearance firebox enclosed by a timber frame plastered The Pyrotech is approved to operate on Natural Gas and Pr...

Page 2: ...afety glass fitted in front of the glass door This safety glass is fitted to this appliance to reduce the risk of injury from burns and at no time should this glass be permanently removed For protecti...

Page 3: ...mensions 12 Freestanding Model Installation Procedure Clearances 13 Lighting Procedure 14 Commissioning Accessing Pilot 15 Maintenance 16 Troubleshooting 17 Service Fan 18 Service Igniter 19 Service B...

Page 4: ...MODEL PYROTECH SPACE HEATER WEIGHT 55 kg INJ SIZE MJ H P T P TYPE 2 x 1 83mm 30 0 90 kpa 2 x 0 90mm 24 2 54 kpa NATURAL GAS APPROVAL NUMBER SERIAL NUMBER DATE OF MANUFACTURE 6877 PROPANE 4 DATA PLATE...

Page 5: ...100mm AGA approved gas cowl should be used Optional extra If the flue is exposed or enclosed with combustible materials an approved 100 150mm twin skin flue is required Optional extra Pyrotech Inbuil...

Page 6: ...er just in front of the 2 square tabs on the log support panel Re installation of glass panels is reverse of above N B ensure that the roped edge of the glass is fitted to the top Figure 7 Place the 2...

Page 7: ...fireplace and place one row of pebbles behind the burner rail Figure 11 Place pebbles between the first row and the angled tray Figure 12 Place remaining pebbles up the angle of the rear tray so as t...

Page 8: ...d D dimensions as shown with frame work included below fire to required height Plasterboard to run beyond stud as shown and to go behind fixing flange on unit Min 25mm clearance NOTE PYROTECH ZERO CLE...

Page 9: ...which is to be fitted to the main fire box as shown on page 10 No Description Qty 1 Panel Side Strip 2 2 Panel Top Strip 1 3 Panel Base 1 4 Panel Side L H 1 5 Panel Side R H 1 6 Panel Rear with cord...

Page 10: ...ide strip and base panel in 6 places Repeat for RH side panel Item 5 Place rear panel Item 6 in behind folds on side panels and base panel Secure rear panel using screws 9 off 3 Place top panel Item 7...

Page 11: ...line Min total flue run 3 6 m Plaster to unit with trim removed Install trim Assemble unit as per pages 5 7 Test the unit for safe operation and show customer correct operating procedures TICK BOXES P...

Page 12: ...12 PYROTECH FREESTANDING MODEL 735mm 220mm 290mm 410mm 870mm Ceiling Ring Ceiling Ring 4 x 900m Flue Lengths Cowl 135mm 750mm 390mm 15mm STANDARD FLUE KIT Gas Pipe...

Page 13: ...supply Connect to adequate power supply Install flue kit maintaining minimum 25mm clearances from outer flue to combustibles Assemble as per pages 5 7 Ensure clearances noted below are maintained A B...

Page 14: ...position 7 Turn the switch on to ignite the main burner The switch is located on the side of the surround trim See page 11 Select high or low fan with the fan switch which is located below the on off...

Page 15: ...te once turned on Figure 1 Remove the two glass panels remove the front panel this is held in place by two screws one on each side Figure 2 Remove the two screws holding the small bracket Remove Hi Lo...

Page 16: ...n Maintenance Task Inspection Cleaning burner logs and controls Accomplishing Person Qualified Service Technician Procedure Inspect valve and ensure that it is operating correctly Check piping for lea...

Page 17: ...a strong spark If gap measures 1 8 replace pilot Check inlet gas pressure It should be 0 90 kpa for Natural Gas 2 54 kpa for L P G Refer Data information plate Clean or replace pilot orifice Check pil...

Page 18: ...ING FOR FAN OPERATION Fan will not operate Ensure that fire had been operating for at least 20 minutes Ensure that snap disc is operating To check this remove the two wires from the snap disc and brid...

Page 19: ...t Do not force the fan Re installation of the fan is the reverse of above REMOVING IGNITOR Figure 1 Prior to connecting the gas line to the unit the piezo ignitor needs to be removed Loosen the wing n...

Page 20: ...move screw from plate at rear of burner and remove plate When removing the burner remove the glass as per pages 5 6 Remove the pilot from the burner as per page 15 Figure 2 Unscrew burner tube at rear...

Page 21: ...21 PARTS LOCATION Power Generator 865mm 635mm 95mm Valve assembly Piezo Ignitor Pilot Thermocouple Pilot Power Generator Valve Piezo Ignitor PARTS KIT Piezo Lead...

Page 22: ...n request Installation position any position Gas families I II and III Maximum gas inlet pressure 60 mbar Outlet pressure setting range 3 30 mbar 20 50 on request Working temperature range 0 70 C Pres...

Page 23: ...trafficable roof designed for personal or public use the end of the flue shall be at least 2 meters above the roof level This dimension is to be increased where necessary so that the minimum distance...

Page 24: ...24 THIS PAGE HAS BEEN LEFT BLANK INTENTIONALLY...

Page 25: ...marble up to flange on Pyrotech Use liquid nails to fix to wall Marble should look like the diagram below once it has been installed and before mantelpiece has been attached 3 Once unit is all set up...

Page 26: ...F G Universal 1810 1220 1090 860 80 100 280 Victorian Arch 1440 1210 885 920 20 20 190 Federation Square 1440 1215 920 920 20 20 235 MANTELPIECE DIMENSIONS D B G C A E Marble Mantel F Trim Firebox Un...

Page 27: ...27 ELECTRICAL DIAGRAM 240V A N E Snap Disc FAN CONTROL Millivolt System Not 240V LO Fan Switch On Off Switch HI Orange Brown White Blue Red E E...

Page 28: ...realflamegeelong hotmail com au Sydney NSW Showroom 654 Pacific Highway Chatswood NSW 2067 Ph 02 8905 0189 Fax 02 8905 0192 E mail info realflame com au Miranda NSW Showroom 36 Kareena Rd Miranda NSW...

Reviews: