1. Battery pack can supply power during mains power failure
2. Battery pack can be operated for approx. 5 cycles in 12 hours
•
Please note:
It is recommended to have a qualified electrician to
install, test and replace battery pack
3. Battery pack contains charging and monitoring hardware
•
Please see below diagram (Red arrow is showing the location of ACCU
for install)
B A T T E R Y P A C K
15 CONTR
OL
UNIT
HOUSING
31 B
A
TTER
Y
P
A
CK
Summary of Contents for Fremont Opener
Page 1: ...INSTALLATION MANUAL INSTALLATION MANUAL FREMONT OPENER...
Page 7: ...5 MOTOR CARRIAG E DIAG RAM M O T O R C A R R I A G E D I A G R A M...
Page 8: ...6 MOTOR CA RRIAG E DIAG RAM...
Page 10: ...8 CON TROL UNI T HOUS ING...
Page 11: ...C O N T R O L U N I T H O U S I N G 15 C ON TROL U NIT HOU SI NG 9 CONTROL UNI T HOUS ING...
Page 29: ...PROGRAMMING A SECOND TRANSMITTER BY RADIO HFL 15 C ON TROL U NIT HOU SI NG 27 TRAN SMI TT ER...
Page 30: ...PROGRAMMING A SECOND TRANSMITTER BY RADIO HFL 28 TRANSMIT TER...
Page 32: ...H O M E L I N K P R O G R A M M I N G 30 HOMEL INK...
Page 34: ...32 BATTERY PACK...