Ready Rack RFSS-18 Assembly Instructions & Parts List Download Page 7

Please visit readyrack.com/guides to find 

more information and other assembly 

instruction guides.

GROVES INCORPORATED

818 TRAKK LN, WOODSTOCK, IL 60098

800-991-2120 • [email protected]

WWW.READYRACK.COM

"WE TAKE CARE OF THE GEAR THAT TAKES CARE OF YOU"

Summary of Contents for RFSS-18

Page 1: ...ASSEMBLY INSTRUCTIONS PARTS LIST Red Rack Freestanding Single Sided WASH DRY STORE PROTECT ITEM RFSS OF COMPARMENTS 18 20 or 24 800 991 9120 SALES GROVES COM WWW READYRACK COM 2021 1...

Page 2: ...S FSL FMB 1 2 3 or 4 W 18 20 or 24 20 PC 4 ALL PARTS SHOWN BELOW Divider panel DP 20 Hanging grommet HWGR Panel end cap PEC End cap ECP Back frame BF 18 20 or 24 Label holder LAB End plugs EPS Hanging...

Page 3: ...frame There is a top and a bottom to each divider You want to make sure that the grid panel design is going the same direction on each divider panel Using the bolts that came attached to the divider...

Page 4: ...D TO INSTALL THE BACK FRAME LEDGE BARS BETWEEN EACH BASE MAKE SURE YOU ATTACH THE REAR AND FRONT BACK FRAME LEDGE BARS BEFORE YOU INSTALL YOUR NEXT BASE THE REAR BACK FRAME LEDGE BAR HELPS HOLD THE ON...

Page 5: ...8 20 or 24 Determine your desired height for the shelves To install tilt the shelf at an upward angle and slide the downward facing hooks through the diagonal wires of the divider panel Then lower the...

Page 6: ...sed hole on the other side of the divider panel and tighten with an allen wrench Move to your right and install the hinge brackets on the second divider panel Attach the hinge to the right side of the...

Page 7: ...com guides to find more information and other assembly instruction guides GROVES INCORPORATED 818 TRAKK LN WOODSTOCK IL 60098 800 991 2120 SALES GROVES COM WWW READYRACK COM WE TAKE CARE OF THE GEAR...

Reviews: