Ready Rack RFSS-18 Assembly Instructions & Parts List Download Page 4

4

STEP 4

With the base attached to the divider panels 

you can now install the adjustable feet. To 

install, line up the holes on the adjustable feet 

to the holes on the foot pad and slide the bolts 

down through the top so the nut will be on the 

bottom of the plate.Tighten nuts. 

NOTE: Repeat this entire step for all bases

.

SPECIAL INSTRUCTIONS:

**For longer locker runs that will be using multiple 
bases, you will need to separate each base by one 

locker compartment.  Starting at the first locker at 

the far end of the locker run, install your longest 

base for that run to the divider panels. Skip a locker 

compartment and attach the next longest base you 
have for that run. Then skip a locker and attach the 

next base. Keep working down the run until you 

have all of the bases on.**

**IF YOU HAVE THE REAR SECURITY PANELS 

AND YOU ARE USING MULTIPLE BASES ON YOUR 
LOCKER RUN, THEN YOU WILL NEED TO INSTALL 
THE BACK FRAME LEDGE BARS BETWEEN EACH 

BASE.  MAKE SURE YOU ATTACH THE REAR AND 

FRONT BACK FRAME LEDGE BARS BEFORE YOU 

INSTALL YOUR NEXT BASE. THE REAR BACK 

FRAME LEDGE BAR HELPS HOLD THE ONE REAR 
SECURITY PANEL IN PLACE WHERE THERE IS NO 

BASE UNDERNEATH IT.**

STEP 3A.1

 

Before installing the base of the unit you will 

need to install the security panels (SP18, 20 or 

24) and the security shelves (SS18, 20 or 24). 

There are two different sides to the security 

panel. The top has a U shaped channel and the 

bottom is an L. Slide the U channel side over the 

top of the back frame. Now lay the panel down 

so that the L shaped bottom is on top of the rack. 

Repeat this process for remaining sections.The 

security shelves look very similar to the helmet 

boot shelves. The difference between the two 

is instead of hooks on the side, the security 

shelves have half circle mounts . These half 

circles slide over the circular tubing at the top 

of the divider panel. Repeat this for all three 

sections. When the base is installed it will hold 

the security shelves and panels in place.

STEP 3A

Summary of Contents for RFSS-18

Page 1: ...ASSEMBLY INSTRUCTIONS PARTS LIST Red Rack Freestanding Single Sided WASH DRY STORE PROTECT ITEM RFSS OF COMPARMENTS 18 20 or 24 800 991 9120 SALES GROVES COM WWW READYRACK COM 2021 1...

Page 2: ...S FSL FMB 1 2 3 or 4 W 18 20 or 24 20 PC 4 ALL PARTS SHOWN BELOW Divider panel DP 20 Hanging grommet HWGR Panel end cap PEC End cap ECP Back frame BF 18 20 or 24 Label holder LAB End plugs EPS Hanging...

Page 3: ...frame There is a top and a bottom to each divider You want to make sure that the grid panel design is going the same direction on each divider panel Using the bolts that came attached to the divider...

Page 4: ...D TO INSTALL THE BACK FRAME LEDGE BARS BETWEEN EACH BASE MAKE SURE YOU ATTACH THE REAR AND FRONT BACK FRAME LEDGE BARS BEFORE YOU INSTALL YOUR NEXT BASE THE REAR BACK FRAME LEDGE BAR HELPS HOLD THE ON...

Page 5: ...8 20 or 24 Determine your desired height for the shelves To install tilt the shelf at an upward angle and slide the downward facing hooks through the diagonal wires of the divider panel Then lower the...

Page 6: ...sed hole on the other side of the divider panel and tighten with an allen wrench Move to your right and install the hinge brackets on the second divider panel Attach the hinge to the right side of the...

Page 7: ...com guides to find more information and other assembly instruction guides GROVES INCORPORATED 818 TRAKK LN WOODSTOCK IL 60098 800 991 2120 SALES GROVES COM WWW READYRACK COM WE TAKE CARE OF THE GEAR...

Reviews: