![Ready Rack RFSS-18 Assembly Instructions & Parts List Download Page 6](http://html1.mh-extra.com/html/ready-rack/rfss-18/rfss-18_assembly-instructions-and-parts-list_1424912006.webp)
6
At this point you may install the bunker pant
hooks (BPH) and any other optional
accessories you have purchased. Such as
additional hangers, helmet holders or personal
property boxes.
STEP 8
STEP 8A
Starting at the far left locker compartment, attach the door latch to the middle set of pre-drilled
holes on the first divider panel. Put the latch on the inside of the compartment and insert one nut
into the latch. Insert the screw into the recessed hole on the other side of the divider panel and
tighten with an allen wrench. Move to your right and install the hinge brackets on the second
divider panel. Attach the hinge to the right side of the divider panel at the top set of pre-drilled
holes and insert one nut. Now insert one screw on the other side and tighten with the allen
wrench. Repeat the process with the other hinge bracket on the bottom set of holes. Keep
repeating the entire process working your way to the right. Make sure you have all latch and
hinge brackets attached before installing the security doors.
INSTALLING OPTIONAL SECURITY DOORS
LATCH
HINGE
INSTALL THE DOOR