![RCT Power Power Storage AC 4.0 Setup & Installation Download Page 13](http://html1.mh-extra.com/html/rct-power/power-storage-ac-4-0/power-storage-ac-4-0_setup-and-installation_1424369013.webp)
13
15
The inverter now connects to the battery.
After the inverter has checked the specifications
and connected to the battery, it starts to arrange
the current sensors.
Once this is done, the inverter resets and flashes
the settings.
After that he starts to calibrate the battery.
The battery is charged to 100%, this may take
several hours.
When calibration is complete, the system
automatically switches to compensation mode.
16
Check, if the Power Sensor has been arranged.
Go to the hompage “online” and press the
“ “ symbol and check the display
Current sensors are tuned = 1
Note:
For further information on installation and operation, please refer to the detailed user manual, which
can be obtained from our website
[9] Switch off the system
Step
Description
1
Switch off the battery via turning the ON / OFF switch to "0".
2
Disconnect the inverter from the mains through the external circuit breaker or mains switch.
3
Wait at least 10 minutes for the capacitors to discharge.
4
Remove the battery connectors (Fig.1, b).
Squeeze the locking of the plug and pull the plug.