![RBI FUTERA FUSION CB-1000 Installation & Operation Manual Download Page 39](http://html1.mh-extra.com/html/rbi/futera-fusion-cb-1000/futera-fusion-cb-1000_installation-and-operation-manual_792350039.webp)
39
TESTING MODULATING BOILER CONTROL
Allow t
he boiler to control itself through the Modulating Boiler Control. Check sticker on the inside of the door
or the Installation Manual for instructions on using the boiler
control.
BOIL TARGET
TANK DIFF
(MODE 3)
PUMP DELAY
BOILER OUT
BOIL MAX
UNITS
BOILER IN
BOIL MIN
MODE
BOIL MASS
TANK TARGET (MODE 3)
BOILER DIFF
SAFETY TESTS CHECKLIST
FLOW SWITCH
LOW WATER CUTOFF
AIR SWITCH
HIGH-LIMIT
COMMISSIONING THE BOILER/WATER HEATER
UNIT CYCLED MIN. OF 15 TIMES
CUSTOMER INSTRUCTED
ALL COVERS REPLACED
CUSTOMER GIVEN MANUAL
TARGET TEMP. SET PER CUSTOMER
COMMISSIONED BY: _____________________________
(SIGNATURE)
DATE: ___________________
THE DELTA T BETWEEN THE HEATERS INLET AND
OUTLET IS CRITICAL TO PROPER FLOW. BEFORE
YOU LEAVE THE JOBSITE, YOU MUST RECORD THE
DELTA T. THIS READING SHOULD NOT EXCEED 35
DEG F, 19.4 DEG C, OR BE LOWER THAN 20 DEG F,
11.1 DEG C.
DELTA T
ADDITIONAL NOTES AND COMMENTS
FLAME SAFEGUARD
SECONDARY
OUTLET TEMP
(FUTERA FUSION ONLY)
SECONDARY
INLET TEMP
(FUTERA FUSION ONLY)