background image

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SYDNEY       

|

       MELBOURNE       

|       

BRISBANE       

|       

PERTH       

|       

AUCKLAND

Australia

 

1300 788 778  |  www.rba.com.au                                        

New Zealand

 0800 722 111  |  www.rbagroup.co.nz

SYDNEY       

|

       MELBOURNE       

|       

BRISBANE       

|       

PERTH       

|       

AUCKLAND

Australia

 

1300 788 778  |  www.rba.com.au                                        

New Zealand

 0800 722 111  |  www.rbagroup.co.nz

SYDNEY  

|

  MELBOURNE  

|  

BRISBANE  

|  

PERTH  

|  

AUCKLAND

Australia   

1300 788 778   www.rba.com.au   

|   

New Zealand   

0800 722 111  www.rbagroup.co.nz

2

 

Components

“P” Trap Stainless Steel Pan  

“S” Trap converter

Security bit

Pre-installation

Installation should be in accordance with local authority and statutory requirements, 
and as per these installation instructions.

Pan is “wall faced” and should preferably be fixed to a masonry wall with
suitable wall anchors provided by others. Supplied with “S” trap converter to
allow either “S” or “P” configuration.

Flushing device should be –
 

 

 

Fowler Tasman Mk 2 (or Stylus Symphony) cistern

 

 

 

Caroma Invisi II (Inceiling mount recommended)

 

 

 

Sloan Dual Flush Valve

Installation

1.   If not pre-formed, make sufficient penetrations through the wall, as
 

determined from the drawing, to allow the 100 mm waste pipe, 50 mm

 

flush pipe, and, if necessary, 12 mm fixing rods to pass through. If front

 

fixed, suitable wall anchors supplied by others.

2.   Determine floor mounting location by mocking up.

3.   Fit a 100 mm pan collar to the outlet with sufficient 100 mm pipe to extend
 

through the wall. (Alternately the waste and flush pipes may be preplumbed

 

and the pan pushed onto the pipework.) If “S” trap configuration

 

is required, location of floor penetration should be centred 220mm from

 

finished wall.

4.   Similarly fit a 50 mm keeseal to the pan inlet with sufficient pipe, as
 

provided by the cistern manufacturer, to extend through the wall.

5.   Push the pan into position and secure the pan to the wall & floor (fixings by
 others).

6.   Make the necessary connections to the waste, and install the cistern and
 

connect according to the manufacturers instructions.

7.   Check for leaks and correct flush volumes, 6 litres full flush and 3 litres half
 flush.

Reviews: