ATTENTION! - CHECK FOR GAS LEAKAGE
At initial set up and at regular intervals we recommend to check for gas leakage
Recommended procedure is as follows:
1.
Connect the regulator and gas hose assembly and tighten all connectors and clamps.
2.
Slowly open the cylinder valve.
3.
Set the flow rate on the regulator to approximately 8-10 L/min.
4.
Close the cylinder valve and pay attention to the needle indicator of the contents pressure gauge on the
regulator, if the needle drops away towards zero there is a gas leak. Sometimes a gas leak can be slow
and to identify it will require leaving the gas pressure in the regulator and line for an extended time period.
In this situation it is recommended to open the cylinder valve, set the flow rate to 8-10 L/min, close the
cylinder valve and check after a minimum of 15 minutes.
5.
If there is a gas loss then check all connectors and clamps for leakage by brushing or spraying with soapy
water, bubbles will appear at the leakage point.
6.
Tighten clamps or fittings to eliminate gas leakage.
IMPORTANT! - We strongly recommend that you check for gas leakage prior to operation of your
machine. We recommend that you close the cylinder valve when the machine is not in use.
Esseti NZ LTD, authorised representatives or agents of Esseti Nz LTD will not be liable or responsible for
the loss of any gas.
SAFETY
7
Summary of Contents for Xcel-Arc MULTI 230 AC/DC
Page 2: ...2 ...
Page 71: ...NOTES 71 ...