WARNINGS
4
BEFORE INSTALLATION
5
Product Receipt
5
Model Identification
5
Ratings and Certifications
5
Installations at Elevation
5
Component Locations
6
GENERAL SAFETY
7
Time/Temperature Relationships in
Scalds
7
INSTALLATION
8
Installation Codes
8
Equipment Base
8
Clearances
8
Combustion and Ventilation Air
9
Conventional Combustion Air Supply
11
Water Piping
12
Hydronic Heating
13
Gas Supply Connections
21
Electrical Power Connections
23
Venting Connections
25
Venting Installation Tips
27
Venting Configurations
27
Condensate Drain
40
Controls
41
WIRING DIAGRAM
44
PRE START-UP
46
ADB Initial Start-Up
48
OPERATION
51
Lighting Instructions
51
To Turn Off Gas to Appliance
51
MAINTENANCE
51
Suggested Minimum
Maintenance Schedule
51
CONNECTING THE CHX
52
APPENDIX
54
Inside Combustion Air Contamination 54
START-UP CHECKLIST
55
WARRANTY
56
CONTENTS
3
Summary of Contents for 751
Page 2: ...2...
Page 6: ...6 Component Locations Fig 1 Component Locations...
Page 15: ...15 Fig 6 Dual Boiler Piping Fig 7 Dual Boiler Piping with CHX...
Page 20: ...20 Fig 13 Single Boiler Pool Application Fig 14 Single Boiler Pool Application with CHX...