Chapter 2: Installing the system
29
2.10Final checks
When you have completed all necessary installation procedures, but before you
apply power to the system, ensure all equipment and connections are properly
secured.
Secure all cables
To prevent strain on the connector blocks, secure the cables to the Course Computer
with cable ties as shown below.
2.11Commission the system before use
The autopilot must be commissioned prior to use. For new systems this involves
calibrating the system, which is a
safety-critical action
.
Section Chapter 3:, Commissioning & Setup
for instructions.
D10396-1
Summary of Contents for SmartPilot X-5R
Page 1: ...SmartPilot X 5R Drive Installation Setup Document reference 87128 1 Date December 2010...
Page 6: ...iv SmartPilot X 5R Drive Installation and Setup Guide...
Page 14: ...6 SmartPilot X 5R Drive Installation and Setup Guide...
Page 38: ...30 SmartPilot X 5R Drive Installation and Setup Guide...
Page 56: ...48 SmartPilot X 5R Drive Installation and Setup Guide...
Page 70: ...62 SmartPilot X 5R Drive Installation and Setup Guide...
Page 74: ...66 SmartPilot X 5R Drive Installation and Setup Guide...