3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning
any installation. It is also useful for any future
additions or maintenance of the system. The
diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Parts supplied
The following parts are supplied with your product.
00
D13543-1
x3
x3
3m
3
1
2
4
5
6
1.
Unit
2.
Mounting seal
3.
3 m (9.84 ft)
SeaTalk
ng®
spur cable
4.
Documentation
5.
M4 x 40mm Threaded studs x 3 (used for surface
mounting)
6.
Finger nuts x 3 (used for surface mounting)
Unpack you product carefully to prevent damage or
loss of parts, check the box contents against the list
above. Retain the packaging and documentation for
future reference.
12
RS150 Installation instructions
Summary of Contents for RS150
Page 2: ......
Page 4: ......
Page 6: ...6 RS150 Installation instructions...
Page 16: ...16 RS150 Installation instructions...
Page 22: ...22 RS150 Installation instructions...
Page 34: ...34 RS150 Installation instructions...
Page 38: ...38 RS150 Installation instructions...
Page 44: ...44 RS150 Installation instructions...
Page 46: ...46 RS150 Installation instructions...
Page 47: ......