武汉锐科光纤激光技术股份有限公司
WUHAN RAYCUS FIBER LASER TECHNOLOGIES CO. LTD.
8
Figure 1: dimensions (unit: mm)
Figure 2: Installation(unit: mm)
2.8 Installation Procedure
a) Check if the power supply has the correct voltage (24VDC±10%), and
the earthline is connected, make sure it is firm and reliable;
b) Place the product in an appropriate position, immobilize it if
necessary;
c) Connect the power cable and control cable to the product when power
supply is OFF;
d) Check the output head and clean it if necessary. This procedure must