
5.2
DELIVERY
WARNING:
5.2.1
The appliance will arrive on site in two
cartons
Box 1 of 2 containing (Fig. 11):
a) boiler fully assembled
b) installation instructions and
user instructions
c) white paper template
d) terminal cover plate (Fig. 12)
e) - 4 coach bolts and wall plugs
- screws and dowels
Polythene bag containing:
a) 2-22 mm compression ball valves
(heating)
b) 1-15 mm compression ball valve
(with drain screw for domestic cold
water inlet)
Maximum allowable flue length 2.5 m.
maximum No. 2x1000 mm.
Flue duct extension used with standard flue
Fig. 13
c) 1-1/2" BSP Union gas cock
d) - 2 15 mm flanged copper tails complete
with 1/2" brass nuts and washers
- 2 22 mm flanged copper tails complete
with 3/4" brass nuts and washers
Box 2 of 2 containing (Fig. 12):
Horizontal CSI flue kit
56 - Flue gas sample point
57 - Flue bend assembly
59 - Rubber seal 0 60
60 - Air intake duct
61 - Flue exhaust duct
62 -Terminal
65 - Pipe centering spring
66 - Flue gas sample point
127 -Terminal rubber
(Contained in the carton Fig. 10)
Fig. 12
OPTIONAL EXTRAS:
Small carton containing: (Fig. 13)
57 - Straight header supplied as an extra cost only
when requested
59 - Rubber seal 0 60
66 - Flue gas sample point
63 - Air intake duct extension
64 - Flue exhaust duct extension
65 - Pipe centering spring
FLUE EXTENSION BOX CONTAINING (Fig. 14)
1000 mm flue extension duct as an extra cost
Only
when requested for side and vertical flue applications
59 - Rubber seal 0 60
1 6
Summary of Contents for CSI 85
Page 26: ...27...
Page 42: ......
Page 45: ...SECTION 9 ELECTRICAL SYSTEM DIAGRAM Fig 94 46...
Page 46: ...47...
Page 47: ......
Page 48: ...49...
Page 52: ......
Page 55: ...Chartists Way Morley Leeds LS27 9ET Telephone 0113 252 7007 Tfax 0113 238 0229...